Laserfiche WebLink
VR-202-Z -49 Exhibit 2 <br /> Data Transfer Unit <br /> The optional Data Transfer Unit can be installed as a replacement for underground wire <br /> and conduit for both the Vapor Flow Meter and Vapor Pressure Sensor. The TS-DTU <br /> must be wired per the INCON Data Transfer Unit Dispenser Retrofit Manual 000-2146 of <br /> the CARB Approved Installation, Operation and Maintenance Manual. A minimum <br /> of two units are required when installing DTUs, one in the GDF and one in <br /> a dispenser. A single site can mix and match between dedicated cables and DTU <br /> installation methods. See Figure 2-21. <br /> Shutdown Control <br /> The Console must be wired per the INCON VRM Install, Operators, and Maintenance <br /> Manual 000-2058 of the CARB Approved Installation, Operation and Maintenance <br /> Manual such that it shall automatically prohibit the dispensing of fuel through shutdown of <br /> individual dispensers during a CP-201 ISD failure alarm. <br /> Console Modules <br /> The VRM Operability Test Procedure in Exhibit 10 and in the INCON VRM Install, <br /> Operators, and Maintenance Manual 000-2058 of the CARB Approved Installation, <br /> Operation, and Maintenance Manual shall be used to verify the proper selection and <br /> setup of the Console Modules. <br /> Training Program <br /> All fuel management system contractors must successfully complete the applicable Franklin <br /> Fueling Systems training program before they can install, startup, and service automatic tank <br /> gauge console equipment. Contractors must have up-to-date FMS Installation - INCON° <br /> Level 1 & FMS Programming - INCON°Level 2 certifications to install and startup consoles <br /> manufactured by Franklin Fueling Systems. Contractors must have an up-to-date VRM <br /> Installation INCON°Level 5 certification to install, startup and service the VRM system. The <br /> schedule, fee and registration information for the Authorized Service Contractor (ASC) training <br /> program can be found at https:HuniversitV.ffspro.com/en/. <br /> Current console and VRM training certification information for contractors whose profiles are <br /> publicly visible can be obtained via the Franklin Fueling Systems certified installers search <br /> page at https://university.ffspro.com/en/search/. Current certification information can also be <br /> obtained by contacting Franklin Fueling Systems at +1 .608.838.8786. <br /> Maintenance <br /> The console, including interface modules, do not require scheduled maintenance. The <br /> VRM System uses a Self-Test Monitoring feature that is designed to verify proper se- <br /> lection, setup and operation of the console and sensors. There is no recommended <br /> maintenance, inspection nor calibration for the Vapor Flow Meter or the Vapor Pressure <br /> Sensor. Servicing should be performed in response to warning or alarm conditions. <br />