Laserfiche WebLink
N <br /> O <br /> N <br /> IV <br /> Gasoline Vapor IN Gasoline Vapor IN <br /> from Existing from Existing <br /> Dispenser Piping Dispenser Piping <br /> 1 <br /> Pipe Union* Vapor Shear Valve 1< <br /> Pipe Nipple` L- 0 <br /> Vapor Flow Meter <br /> Weatherproof U7 (supplied by Franklin '' ` <br /> Junction Box — Fueling Systmes) � <br /> 1.5'NPT Reducing Vapor Flow Meter rF <br /> Bushing* Weatherproof ==__- _77 (supplied by Franklin O <br /> Junction Box1.5'NPT -_ Fueling Systems) <br /> � TT <br /> Piping Nipple N <br /> Approxim tely 10" J=� . Q m <br /> r U ® =- N <br /> p W <br /> 0 -1 <br /> Z0z <br /> 0 <br /> nySafe Conduit <br /> to Tak SeAf inel Console _..... <br /> Intrinsically Safe Conduit � Z <br /> 1.5"NPT to 1"NPT to Tank Sentinel Console 1.5"NPT Nipple _... r <br /> Reducing Bushing .-r - -- 0 <br /> ► <br /> 1'NPT Pipe __ O <br /> Nipple <br /> 1.5"Pipe Union I� <br /> Required"Y"fitting for introducing rF <br /> Vapor Shear Valve ,liquid during TP-201.4 tlynamic CD <br /> backpressuretest. <br /> .............. N <br /> O <br /> Gasoline Vapor Out <br /> to Field Piping Gasoline Vapor Out m <br /> to Field Piping �( <br /> S <br /> Figure 1 Figure 2 S <br /> Flow Meter Above Shear Valve Flow Meter Below Shear Valve rh <br /> N <br />