My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
1630
>
2300 - Underground Storage Tank Program
>
PR0518624
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/8/2021 4:48:00 PM
Creation date
2/22/2021 2:00:28 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0518624
PE
2371
FACILITY_ID
FA0024496
FACILITY_NAME
Costco Wholesale #38 (Gas Station)
STREET_NUMBER
1630
Direction
E
STREET_NAME
HAMMER
STREET_TYPE
Ln
City
Stockton
Zip
95210
APN
09428011
CURRENT_STATUS
01
SITE_LOCATION
1630 E Hammer Ln
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
763
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
VR-202-Z -6 Exhibit 3 <br /> Option 2 - INCON Vapor Recovery Monitoring (VRM) <br /> Manufacturing Performance Standards and Specifications <br /> The INCON VRM System and all components shall be manufactured in compliance with <br /> the performance standards and specifications in CP-201 (amended January 9, 2013), as <br /> well as the requirements specified in this Executive Order. All components (Exhibit 1) <br /> shall be manufactured as certified; no change to the equipment, parts, design, materials <br /> or manufacturing process shall be made unless approved in writing by the Executive <br /> Officer or Executive Officer delegate. Unless specified in Exhibit 2 or in the CARB <br /> Approved Installation, Operation and Maintenance Manual, the requirements of this <br /> section apply to the manufacturing process and are not appropriate for determining the <br /> compliance status of a gasoline dispensing facility. <br /> 1. CONSOLE <br /> a. Every INCON Console has been designed and manufactured to have an <br /> Operating Temperature Range of 32°F to 104°F (0°C to 40°C) and Storage <br /> Temperature Range of-4°F to 140°F (-20°C to 600C). <br /> b. Every INCON Console system including software, sensors and modules <br /> have been designed and is Underwriters Laboratories (UL) approved for <br /> operation near potentially hazardous fuel storage tanks. <br /> c. Every INCON Console system including software, sensors and modules have <br /> been designed and tested in accordance with ISO-9001 manufacturing quality <br /> standards. <br /> 2. VRM SOFTWARE' <br /> a. Every INCON Console with VRM software is manufactured to the <br /> specifications that passed the operational test and is compliant with CP-201 <br /> ISD performance standards and specifications. <br /> b. Every INCON Console with VRM software has been designed, manufactured <br /> and tested to continually monitor the connectivity and operability status of all <br /> sensors and modules. All Console VRM software has been designed, <br /> manufactured and tested to issue a visual, audible as well as printed <br /> notification upon failure of the connectivity or operability status of sensors and <br /> modules. <br /> 3. VAPOR FLOW METER <br /> Every INCON Vapor Flow Meter is designed, tested and manufactured to <br /> interface to the INCON Console. The Vapor Flow Meter has been designed and <br /> tested for measuring flow between 1 - 100 GPM in HC concentrations between <br /> 0 — 100% saturation across a -40°F to 140°F (-40°C to 60°C) operating range. <br /> 'INCON/TS-VRM software Versions 1.0.0 and 1.1.0 are approved for and shall be used or installed only <br /> with uni-hose dispensers. <br />
The URL can be used to link to this page
Your browser does not support the video tag.