Laserfiche WebLink
Executive Order VR-201-Z and VR-202-Z <br /> Assist Phase II EVR System <br /> Exhibit 8 <br /> REQUIRED ITEMS IN CONDUCTING TP-201.3 <br /> For GDF installations using the FFS Clean Air Separator(CAS) proceed to Part A. <br /> For GDF installations using the ARID Permeator AT-150 (Permeator), proceed to Part B. <br /> PART A - REQUIRED ITEMS IN CONDUCTING TP-201.3 FOR CAS INSTALLATIONS <br /> The instructions below are required when conducting TP-201.3 for these systems. The tester <br /> shall document that each step was followed as indicated below and shall include this page of the <br /> Exhibit with the submission of TP-201.3 test results. Note that districts may require use of an <br /> alternate form to meet these requirements, provided the alternate form includes the same <br /> minimum parameters. <br /> 1. Prior to conducting TP-201.3, all four ball valves on the Healy Clean Air Separator <br /> (CAS) shall be closed, as shown in Figure 8-1 or Figure 8-1 H, to isolate it from the <br /> Underground Storage Tank (UST) system to permit the pressurization of the UST <br /> system. Figure 8-1 applies to vertical Clean Air Separator installations and Figure 8-1 H <br /> applies to horizontal Clean Air Separator installations. <br /> 2. Conducting TP-201.3 with any dispenser piping test valve in the closed position is not <br /> permitted. Any dispenser with a dispenser piping test valve in the closed position while <br /> conducting TP-201.3 will bias the test towards compliance. <br /> 3. After conducting TP-201.3, the four ball valves on the Healy Clean Air Separator (CAS) <br /> shall be locked in their normal operating positions as shown in <br /> Figure 2-2 or 2-2H, Exhibit 2 of Executive Orders VR-201 and VR-202. Figure 2-2 <br /> applies to vertical Clean Air Separator installations and Figure 2-21-1 applies to horizontal <br /> Clean Air Separator installations. <br /> Required Steps Verification <br /> (please circle) <br /> 1. All four Clean Air Separator ball valves closed before Yes No <br /> conducting TP-201.3 <br /> 2. All dispenser piping test valves open before conducting TP- Yes No <br /> 201.3 <br /> 3. All four Clean Air Separator ball valves in normal operating Yes No <br /> positions after conducting TP-201.3. <br /> Test Company: Facility Name: <br /> Print Name (Technician) Signature Date <br /> Technician Certification Number ICC or Expiration Date <br /> District Training Certification, as applicable) <br />