Laserfiche WebLink
NOTICE: <br /> The CARB Approved Installation, Operation and Maintenance Manual for VR-201 <br /> and VR-202 describes the tools, method and skill levels required to install both the <br /> Assist Phase II EVR System Not Including ISD, CARB Executive Order VR-201 <br /> and the Assist Phase II EVR System Including ISD Systems, CARB Executive <br /> Order VR-202. <br /> In addition to the training requirements below, the contractor is responsible for providing <br /> the warranty tag, included with each component, to the service station owner/operator <br /> at the time of installation. Additional certification may be required in accordance with <br /> local district requirements. <br /> Unless specified otherwise, only skilled technicians that are trained, certified and <br /> licensed by Franklin Fueling Systems (i.e. Healy or INCON Certified Technicians) are <br /> able to perform installation, maintenance or repairs of components manufactured by <br /> Franklin Fueling Systems or warranty will be void. However, GDF Owner/ Operator can <br /> remove and install hanging hardware (nozzle, curb hose, breakaway, flow limiter and <br /> whip hose). <br /> It is the responsibility of each Healy Certified Technician to be familiar with the current <br /> requirements of state, federal, local codes and air district rules and regulations for <br /> installation and repair of gasoline dispensing equipment. <br /> It is also the responsibility of the Healy Certified Technician to be aware of all the <br /> necessary safety precautions and site safety requirements to assure a safe and trouble <br /> free installation. <br /> Unless specified otherwise, only skilled technicians that are trained, certified and <br /> licensed by Veeder-Root are able to perform installation, maintenance or repairs of <br /> components manufactured by Veeder-Root, or warranty will be void. <br /> It is the responsibility of each Veeder-Root technician to be familiar with the current <br /> requirements of state, federal, local codes and air district rules and regulations for <br /> installation and repair of gasoline dispensing equipment. <br /> It is also the responsibility of the Veeder-Root technician to be aware of all the <br /> necessary safety precautions and site safety requirements to assure a safe and trouble <br /> free installation. <br /> It is the responsibility of each INCON Certified Technician to be familiar with the current <br /> requirements of state, federal, local codes and air district rules and regulations for <br /> installation and repair of gasoline dispensing equipment. <br /> ii <br /> CARB Approved IOM—Cover Page- Executive Orders VR-201 and VR-202 <br />