Laserfiche WebLink
7. Remove the shear pin (#787-1) located in the spare shear pin location of the breakaway and <br /> install in place of the original. <br /> 8. Torque the shear pin to 20 inch-pounds (— 1.5 ft-lbs). DO NOT OVER-TIGHTEN. <br /> 9. If available, install a shear pin (#787-1) in the spare shear pin location. <br /> 10. Remove the Breakaway Reconnection Clamp. <br /> 11. Proceed with the tests outlined in Section 1.4 of the Healy Systems Scheduled Maintenance. <br /> Figure 1 Figure 2 <br /> Top Clamp <br /> Bottom Clamp <br /> Tool Grip <br /> A <br /> Figure 3 Figure 4 <br /> Spare Shear <br /> Pin <br /> Shear Pin Installation J <br /> mo", Dowel in <br /> Shear Pin Bushing Hole <br /> Dowel Guide <br /> 5 <br /> B-s <br /> CARD Approved IBM B-Healy Breakaway Model B07 Swivel-Executive Orders VR-20I and VR-POP <br />