Laserfiche WebLink
VST Installation Procedure for <br /> Phase II EVR Vacuum Assist <br /> Safety Breakaway Devices <br /> Part Number Series: <br /> VST-HEVR-SBK; <br /> VST-ISVR-SBK <br /> 4. Tighten breakaway connection to 50 ft.-lbs. of torque. DO NOT OVER 7. Measure the resistance between the dispenser outlet casting and the tip of <br /> TIGHTEN. Use the hex on the breakaway body to tighten. Use a torque the nozzle spout.Use an electronic multimeter set on the high range of the <br /> wrench with an open-end attachment to fit the hose couplings and an open- ohmmeter function.Resistance should not indicate more than 70,000 ohms <br /> end wrench to properly tighten breakaway connections. DO NOT USE per foot of hose.Example:The measured resistance for a 12-foot hose must <br /> channel-locks or pliers to tighten connections.Proper ft.-Ib.torque may not not exceed 840,000 ohms(840 kilohms). <br /> be achieved with these tools. BREAKAWAY REATTACHMENT PROCEDURES <br /> 5. Purge air from the system by pumping one-tenth(1/10)to two tenths(2/10) These VST reattachable breakaways can be reconnected in either one of two <br /> of a gallon of fuel into an approved container.Inspect each breakawayjoint methods: <br /> connection for liquid leaks and meter creep. Make proper adjustments at METHOD 1:Use of the VST Breakaway Assembly Tool(VST-BAT-200)with the <br /> the breakaway connection if necessary. <br /> appropriate reassembly plates for this breakaway. <br /> 6. Check the nozzle shut-off action by dispensing fuel into an approved 1. Follow INSTALLATION PREPARATION steps 1 -3. <br /> container at least three times to assure proper automatic operation. To <br /> test,operate the nozzle and submerge the spout tip in fuel until the fuel 2. Inspect both safety breakaway halves for damage that may have occurred <br /> level covers the vent hole.The main valve of the nozzle automatically shuts during separation. Include looking for external damage to the product, <br /> off when liquid covers the vent hole at the end of the spout.The dispenser damaged threads,damaged 0-rings,missing 0-rings,proper placement of <br /> should deliver a minimum of 3 gpm. Hold open latch will disengage 0-rings,etc.If damage is detected,replace with new product. <br /> automatically when liquid covers the vent hole in the spout. 3. Prior to reassembling,be sure the mating parts are undamaged and clean. <br /> Figure 2. 4. Lightly lubricate ALL 0-rings on mating connections with petroleum jelly or <br /> VST Breakaway Assembly Tool other suitable lubricant. <br /> 5. Utilize the VST Breakaway Assembly Tool with the appropriate reassembly <br /> plates to reassemble the breakaway.The tool is used to provide appropriate <br /> leverage for the ease of reassembly of the breakaway.This can be done <br /> without disassembling the hoses from the breakaway halves.See Figure 2. <br /> 6. Press the button on the VST Breakaway Assembly Tool to spread the end <br /> clamps apart. This will allow for the two separated breakaway halves to fit <br /> between the top and bottom clamps. <br /> 7. Slide the top clamp of the VST Breakaway Assembly Tool behind the hex on <br /> the breakaway half still connected to the whip hose.See Figure 2. <br /> 8. Slide the separated bottom half of the breakaway, with curb hose and <br /> nozzle attached, onto the bottom clamp of the VST Breakaway Assembly <br /> Tool.See Figure 2. <br /> w 9. Slowly squeeze the VST Breakaway Assembly Tool trigger to bring the <br /> breakaway halves together. <br /> 10.Carefully align the two breakaway halves. <br /> " a. Align the anti-rotation studs(2)inside the breakaway half on the curb <br /> 19$ hose with the slots(2)on the other half of the breakaway attached to the <br /> whip hose.See Figure 3. <br /> �r 11.Continue squeezing the VST Breakaway Assembly Tool trigger to finish <br /> reassembly. <br /> 12.The two aligned breakaway halves need to be assembled concentrically <br /> (properly aligned)until they snap into place. <br /> a. Listen for a "click"to indicate that the two halves have been properly <br /> t reattached. <br /> b. If the two breakaway halves become cocked(misaligned)or otherwise <br /> do not snap together easily,pull them apart and repeat steps 7-12. <br /> CAUTION:Reconnection can cause a small amount of gasoline to leak out of <br /> the breakaway. A towel wrapped loosely around the breakaway can help to <br /> minimize spills. <br /> 6-2 <br /> CARB Approved IOM 6—EVR Vacuum Assist Breakaways VR-201 and VR-202 09/16 <br />