Laserfiche WebLink
13. TESTING THE SYSTEM: <br /> Carefully review all work completed, being sure all mechanical joints are thoroughly <br /> tightened and electrical connections sealed. <br /> - Open the product crash valves and restore power to the dispenser. <br /> - With the power on, but no nozzles authorized, the VP1000 should not be running (unless <br /> the ambient temperature is below 40°F), but the power LED (yellow) should be energized <br /> on the interface module. <br /> - Authorize one handle and the vacuum system should activate when the gasoline flow <br /> control valve is engaged. Repeat for all other nozzles, individually testing each nozzle on <br /> each side of dispenser. With each authorization, one of the green LED's on the interface <br /> module should illuminate and the VP1000 activate. <br /> - Note: For unihose dispensers, conduct individual tests for each product grade on each side <br /> of the dispener to ensure that the same LED activates for all grades on the same side. If <br /> the other LED activates, wiring needs to be corrected. <br /> - Authorize one nozzle, listen to the speed of the VP1000. With one nozzle activated, the <br /> speed will be slower than if a nozzle on each side is activated. Activate a nozzle on the <br /> other side of the dispenser and listen for the speed to change. <br /> - To test the tightness of the vapor plumbing installed on the suction side of the system <br /> requires a 0-100" water column gauge. Connect the gauge into the 1/4" test port of the <br /> adaptor tee installed earlier in section 8 Photo J. Continue by following and completing the <br /> START-UP / NEW INSTALLATION/ WARRANTY/ANNUAL TESTING FORM. <br /> 8-13 <br /> GARB Approved IOM 8-Gilharco Encore 300 B 50O Series-Executive Orders VR-20I and VR-202 <br />