My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
1630
>
2300 - Underground Storage Tank Program
>
PR0518624
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/8/2021 4:48:00 PM
Creation date
2/22/2021 2:00:28 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0518624
PE
2371
FACILITY_ID
FA0024496
FACILITY_NAME
Costco Wholesale #38 (Gas Station)
STREET_NUMBER
1630
Direction
E
STREET_NAME
HAMMER
STREET_TYPE
Ln
City
Stockton
Zip
95210
APN
09428011
CURRENT_STATUS
01
SITE_LOCATION
1630 E Hammer Ln
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
763
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
15. VAPORVACTm REMOVAL: <br /> Described below are the steps necessary to remove a VaporVacTm and re-plumb the vapor <br /> lines to install the Healy VP1000 series vapor assist recovery system. <br /> ❑ Removal of the VaporVac pumps requires the top cover of the dispenser be removed. <br /> From the top of the cover, remove the four corner bolts and lifting eyes if present, along <br /> with various washers. Remove the cover. Save hardware for reinstallation. <br /> ❑ With the top removed, notice the `loose' cross rails that the top cover bolts were screwed in <br /> to — remove these rails and save for reinstallation after conversion. <br /> ❑ Be sure all electrical power to the dispenser has been disconnected and disconnect the <br /> electrical connections going to each pump. <br /> ❑ Loosen and disconnect all the vapor pipes from both VAC pumps. Do not remove the <br /> vapor pipes from the product outlets, see photos Q and R. <br /> ❑ From one of the pumps, remove the 3/4" NPT X 1" flare elbow fitting and save for use <br /> below. Remove the two brackets and motors. <br /> 4. <br /> b ' - <br /> Photo Q Photo R <br /> ❑ Into the 3/4" x 1" elbow that was removed above, attach the 3/4" x 1/2" bell reducer <br /> supplied in place of the 3/4" coupling shown in Photo S and then install the 1/2" NPT x 1/2" <br /> x 1/2" flare tee using tape. Tighten with the branch pointing opposite the flare connection, <br /> and then attach the flare fitting to the vapor down pipe fitting, see photo S. <br /> ❑ Connect the loose vapor tube fitting from the dispenser outlet to the run flare position <br /> on the tee. Cut and flare a piece of 1/2" copper tube suitable to connect the other vapor <br /> connection to the tee using the 1/2"x 1/2" flare elbow fitting supplied, see photo T. <br /> 8-15 <br /> CARO Approved IOM 8-Gilbarco Encore 300 E 500 Series-Executive Orders VR-201 and VR-202 <br />
The URL can be used to link to this page
Your browser does not support the video tag.