My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
1630
>
2300 - Underground Storage Tank Program
>
PR0518624
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/8/2021 4:48:00 PM
Creation date
2/22/2021 2:00:28 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0518624
PE
2371
FACILITY_ID
FA0024496
FACILITY_NAME
Costco Wholesale #38 (Gas Station)
STREET_NUMBER
1630
Direction
E
STREET_NAME
HAMMER
STREET_TYPE
Ln
City
Stockton
Zip
95210
APN
09428011
CURRENT_STATUS
01
SITE_LOCATION
1630 E Hammer Ln
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
763
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
18. LOCATION CHANGE OF HEALY VP1000 ON ENCORE SERIES ISD ENABLED DISPENSERS <br /> 1. DESCRIPTION OF NEW VP1000 POSITION <br /> To accommodate room for the ISD vapor flow meter and facilitate proper connection above a <br /> vapor line shear valve, the Healy VP1000 Vacuum Pump has been moved up approximately <br /> 20 inches in the hydraulics compartment from position A to position B as shown in Figure 1 <br /> below. <br /> Note: Encore Series Dispensers may be field retrofit with the Healy VP1000 ISD <br /> Enabled by ordering Gilbarco Kit M07801 S001 (contains all required parts and <br /> instructions). <br /> Figure 1 <br /> r t <br /> 4 � t <br /> i B) New VP1000 <br /> position for Encore <br /> ISD Enabled Encore <br /> Series dispenser <br /> s option <br /> A) Standard VP 1000 <br /> position for Healy kit <br /> Z082 &Z083 <br /> The ball valve and test port required for Healy startup testing and troubleshooting have been <br /> moved to locations C and D as shown below in Figure 2. <br /> 8-21 <br /> CARR Approved IOM 8-Gilbarco Encore 300 E OOO Series-Executive Orders VR-201 and VR-202 <br />
The URL can be used to link to this page
Your browser does not support the video tag.