Laserfiche WebLink
1. PURPOSE: <br /> This procedure describes the tools, methods and skill levels required to install a Healy <br /> Systems, Inc. Model VP1000 Vapor Recovery pump in non-vapor ready GasboyTM model 9800 <br /> series gasoline dispensers. Only Healy trained and certified contractors will be able to perform <br /> these retrofits or warranty will be void. The installer shall be a skilled petroleum technician and <br /> thoroughly familiar with the requirements of State, Federal and local codes for installation and <br /> repair of gasoline dispensing equipment. Also, they shall be aware of all the necessary safety <br /> precautions and site safety requirements to assure a safe and trouble free installation. NOTE: <br /> All electrical and hydraulic plumbing fittings referred to in these instructions must be UL "listed" <br /> or "recognized" for the purpose. <br /> Note: Installations of vapor piping into the inlet side of the vacuum pump should be <br /> sloped such that the natural flow direction is toward the vacuum pump. However, <br /> it is permissible to have a piping slope tilted away from the vacuum pump provided <br /> that all other applicable tests (Dispenser integrity and V/L) meet the specifications <br /> outlined in the appropriate section of the Executive Order and CARB Approved <br /> Installation, Operation and Maintenance Manual. <br /> Note: For installations with In-Station Diagnostics (ISD), the vapor flow meter shall be <br /> installed on the down stream side of the vacuum pump. Every effort shall be made <br /> to install the vapor flow meter so that vapor piping between the vacuum pump and <br /> the vapor flow meter is sloped such that the natural flow direction is toward the <br /> vapor flow meter. However, it is permissible to have the piping slope away from the <br /> vapor flow meter provided that all other applicable tests (Dispenser integrity, V/L and <br /> ISD Operability) meet the specifications outlined in the appropriate section of the <br /> Executive Order and CARB Approved Installation, Operation and Maintenance <br /> Manual. <br /> 2. SAFETY: <br /> Before installing the equipment, read, understand and follow: <br /> - The National Electrical Code (NFPA 70) <br /> - The Automotive and Marine Service Code (NFPA 30A) <br /> -Any national, state and local codes that may apply. <br /> The failure to install the equipment in accordance with NFPA 30A and 70 may adversely affect <br /> the safe use and operation of the system. <br /> Accurate, sound installations reduce service calls: Use experienced, licensed contractors <br /> that practice accurate, safe installation techniques. Careful installation provides a sound <br /> troubleshooting framework for field repairs and can eliminate potential problems. <br /> 1. Read all instructions before beginning. <br /> 2. Follow all safety precautions: <br /> ❑ Barricade the area. <br /> ❑ Do not allow vehicles or unauthorized people in the area. <br /> ❑ Do not smoke or allow open flames in the area. <br /> ❑ Do not use power tools in the work area. <br /> ❑ Wear eye protection during installation. <br /> 3. Use circuit breakers for multiple disconnects to turn off power and prevent feedback from <br /> other dispensers. <br /> 2 <br /> CARB Approved IN B-Gilbarco Gasboy OBBO Series-Executive Orders VR-261 and VR-262 <br />