My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
1630
>
2300 - Underground Storage Tank Program
>
PR0518624
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/8/2021 4:48:00 PM
Creation date
2/22/2021 2:00:28 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0518624
PE
2371
FACILITY_ID
FA0024496
FACILITY_NAME
Costco Wholesale #38 (Gas Station)
STREET_NUMBER
1630
Direction
E
STREET_NAME
HAMMER
STREET_TYPE
Ln
City
Stockton
Zip
95210
APN
09428011
CURRENT_STATUS
01
SITE_LOCATION
1630 E Hammer Ln
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
763
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
11. INSTALLING THE SEALED NIPPLE ASSEMBLY: (See Photos I & J) <br /> NOTICE: THE INTERFACE MODULE THAT IS SUPPLIED HAS A HARNESS <br /> ATTACHED AND A WIRING PLUG FOR THE AC CONNECTIONS. ALSO SUPPLIED IS <br /> THE SEALED NIPPLE ASSEMBLY (1346) THAT MUST BE USED BETWEEN THE DIVISION <br /> 1 AREA (THE ELECTRONICS COMPARTMENT)AND THE DIVISION 2 AREA(THE SPACE <br /> ABOVE AND OUTSIDE THE ELECTRONICS COMPARTMENT). <br /> rV — F, <br /> Photo I Photo J <br /> ❑ Remove the bolts and washers that seal the access hole on the bottom left side of the "J" <br /> box. <br /> ❑ Get the 1346 sealed nipple assembly and carefully remove the first nut and washer over <br /> the wires. Thread these wires from inside the electronics compartment, up through the <br /> bottom hole uncovered above. Carefully replace the washer and nut over the wires and <br /> secure the unit into the box. <br /> ❑ At the VP1000, get and install the 1/2" male x 3/4" female adaptor over the wires coming <br /> from the motor. Do not use pipe dope on these fittings and be sure there is at least five full <br /> threads of engagement of the fittings in their respective couplings. <br /> ❑ Remove the nut from one of the 3/4" elbow connectors, thread the pump wires through <br /> the elbow and screw the threaded end with the "O" ring into the 1/2" male X 3/4" female <br /> adaptor. <br /> ❑ Thread the wires through the 30" piece of non-Oetallic electrical tubing and then twist the <br /> tubing onto the elbow on the motor until the rubber washer is compressed. <br /> ❑ Get the other elbow connector, remove only the nut (leave the o-ring in place) then thread <br /> the motor wires through the elbow and screw the fitting into the 3/4" tubing. Use care not to <br /> twist the wires. <br /> ❑ Thread the wires into the electrical junction box, pull up tightly and secure the fitting to the <br /> box using the nut removed above. <br /> ❑ In the "J" box, leave about 6" of wire on both the wires coming from the motor and from the <br /> sealed nipple, cut off excess wire and strip approximately 1/2" of insulation from all wires. <br /> B-10 <br /> GARB Approved IBM 8-Wayne Harmony Series(Balance)-Executive Orders VR-201 and VR-202 <br />
The URL can be used to link to this page
Your browser does not support the video tag.