My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
1630
>
2300 - Underground Storage Tank Program
>
PR0518624
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/8/2021 4:48:00 PM
Creation date
2/22/2021 2:00:28 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0518624
PE
2371
FACILITY_ID
FA0024496
FACILITY_NAME
Costco Wholesale #38 (Gas Station)
STREET_NUMBER
1630
Direction
E
STREET_NAME
HAMMER
STREET_TYPE
Ln
City
Stockton
Zip
95210
APN
09428011
CURRENT_STATUS
01
SITE_LOCATION
1630 E Hammer Ln
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
763
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-4- <br /> • Exhibit 11, Liquid Condensate Trap Compliance Test Procedure (if applicable); <br /> • Exhibit 14, Dispenser Integrity Test; <br /> • Exhibit 15, Determination of Performance of the ARID Permeator AT-150 <br /> Processor (applicable, if a Permeator AT-150 is installed); <br /> Districts may specify the sequencing of the above tests. Notification of testing, and <br /> submittal of test results, shall be done in accordance with District requirements and <br /> pursuant to policies established by that District. Districts may require the use of <br /> alternate test form(s), provided they include the same minimum parameters identified in <br /> the datasheet referenced in the test procedure(s). Alternative test procedures, including <br /> most recent versions of the test procedures listed above, may be used if determined by <br /> the CARB Executive Officer or his delegate, in writing, to yield equivalent results; <br /> IT IS FURTHER ORDERED that the following requirements are made a condition of <br /> certification. The owner or operator of the Assist Phase II EVR System including ISD <br /> shall conduct, and pass, the following tests no later than 60 days after startup using <br /> Exhibit 7, Nozzle Bag Test Procedure. TP-201.4, Dynamic Back Pressure <br /> (July 3, 2002), shall be conducted in accordance with the conditions listed in item 1 of <br /> the Vapor Recovery Piping Configurations Section of Exhibit 2. Districts have the <br /> authority to require conducting of Exhibit 5, Vapor to Liquid Volume Ratio, in lieu of <br /> TP-201.4, Dynamic Back Pressure (July 3, 2002), provided that at least two gallons of <br /> product are introduced into the system through each dispenser riser prior to conducting <br /> the test. Notification of testing, and submittal of test results, shall be done in <br /> accordance with District requirements and pursuant to the policies established by that <br /> District. Districts may require the use of alternate test form(s), provided they include the <br /> same minimum parameters identified in the datasheet referenced in the test <br /> procedure(s). Alternative test procedures, including most recent versions of the test <br /> procedures listed above, may be used if determined by the CARB Executive Officer or <br /> his delegate, in writing, to yield equivalent results; <br /> IT IS FURTHER ORDERED that, except as provided above, Districts at their discretion <br /> will specify the testing, related sequencing, and testing frequency of the nozzle vapor <br /> valves. If nozzle vapor valve tests are required by the District, the test shall be <br /> conducted in accordance with Exhibit 7, Nozzle Bag Test Procedure; <br /> IT IS FURTHER ORDERED that the Assist Phase II EVR System including ISD shall be <br /> compatible with gasoline in common use in California at the time of certification. The <br /> Assist Phase II EVR System including ISD is not compatible with gasoline containing <br /> more than 15 percent methanol, 15 percent ethanol, or 15 percent methyl tertiary butyl <br /> ether. Any modifications to comply with future California gasoline requirements shall be <br /> approved in writing by the CARB Executive Officer or his delegate; <br /> IT IS FURTHER ORDERED that Assist Phase II EVR System including ISD installations <br /> using the ARID Permeator AT-150 Processor must use Veeder-Root version 1.06 ISD <br /> software; <br /> Assist Phase 11 EVR System Including ISD—VR-202-Z <br />
The URL can be used to link to this page
Your browser does not support the video tag.