Laserfiche WebLink
-4- <br /> • Exhibit 11, Liquid Condensate Trap Compliance Test Procedure (if applicable); <br /> • Exhibit 14, Dispenser Integrity Test; <br /> • Exhibit 15, Determination of Performance of the ARID Permeator AT-150 <br /> Processor (applicable, if a Permeator AT-150 is installed); <br /> Districts may specify the sequencing of the above tests. Notification of testing, and <br /> submittal of test results, shall be done in accordance with District requirements and <br /> pursuant to policies established by that District. Districts may require the use of <br /> alternate test form(s), provided they include the same minimum parameters identified in <br /> the datasheet referenced in the test procedure(s). Alternative test procedures, including <br /> most recent versions of the test procedures listed above, may be used if determined by <br /> the CARB Executive Officer or his delegate, in writing, to yield equivalent results; <br /> IT IS FURTHER ORDERED that the following requirements are made a condition of <br /> certification. The owner or operator of the Assist Phase II EVR System including ISD <br /> shall conduct, and pass, the following tests no later than 60 days after startup using <br /> Exhibit 7, Nozzle Bag Test Procedure. TP-201.4, Dynamic Back Pressure <br /> (July 3, 2002), shall be conducted in accordance with the conditions listed in item 1 of <br /> the Vapor Recovery Piping Configurations Section of Exhibit 2. Districts have the <br /> authority to require conducting of Exhibit 5, Vapor to Liquid Volume Ratio, in lieu of <br /> TP-201.4, Dynamic Back Pressure (July 3, 2002), provided that at least two gallons of <br /> product are introduced into the system through each dispenser riser prior to conducting <br /> the test. Notification of testing, and submittal of test results, shall be done in <br /> accordance with District requirements and pursuant to the policies established by that <br /> District. Districts may require the use of alternate test form(s), provided they include the <br /> same minimum parameters identified in the datasheet referenced in the test <br /> procedure(s). Alternative test procedures, including most recent versions of the test <br /> procedures listed above, may be used if determined by the CARB Executive Officer or <br /> his delegate, in writing, to yield equivalent results; <br /> IT IS FURTHER ORDERED that, except as provided above, Districts at their discretion <br /> will specify the testing, related sequencing, and testing frequency of the nozzle vapor <br /> valves. If nozzle vapor valve tests are required by the District, the test shall be <br /> conducted in accordance with Exhibit 7, Nozzle Bag Test Procedure; <br /> IT IS FURTHER ORDERED that the Assist Phase II EVR System including ISD shall be <br /> compatible with gasoline in common use in California at the time of certification. The <br /> Assist Phase II EVR System including ISD is not compatible with gasoline containing <br /> more than 15 percent methanol, 15 percent ethanol, or 15 percent methyl tertiary butyl <br /> ether. Any modifications to comply with future California gasoline requirements shall be <br /> approved in writing by the CARB Executive Officer or his delegate; <br /> IT IS FURTHER ORDERED that Assist Phase II EVR System including ISD installations <br /> using the ARID Permeator AT-150 Processor must use Veeder-Root version 1.06 ISD <br /> software; <br /> Assist Phase 11 EVR System Including ISD—VR-202-Z <br />