My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
1630
>
2300 - Underground Storage Tank Program
>
PR0518624
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/8/2021 4:48:00 PM
Creation date
2/22/2021 2:00:28 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0518624
PE
2371
FACILITY_ID
FA0024496
FACILITY_NAME
Costco Wholesale #38 (Gas Station)
STREET_NUMBER
1630
Direction
E
STREET_NAME
HAMMER
STREET_TYPE
Ln
City
Stockton
Zip
95210
APN
09428011
CURRENT_STATUS
01
SITE_LOCATION
1630 E Hammer Ln
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
763
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MOTOR SPECIFICATIONS <br /> Horsepower 1/8 HP <br /> Voltage 120 VAC <br /> INTERFACE SPECIFICATIONS <br /> Input voltage 120 VAC <br /> Relay current capacity 5AAC <br /> Input signals AC and DC voltages up to 130 VAC max <br /> Motor Input signal 5 VDC @ 20 Hz 50% Duty Cycle <br /> 15. TESTING THE SYSTEM: <br /> - Carefully review all work completed, being sure all mechanical joints are thoroughly <br /> tightened and electrical connections sealed. <br /> - Open the product crash valves and restore power to the dispenser. <br /> - With the power on, but no nozzles authorized, the VP1000 should not be running (unless <br /> the ambient temperature is below 40°F), but the power LED (yellow) should be energized <br /> on the interface module. <br /> - Authorize one handle and the vacuum system should activate when the gasoline flow <br /> control valve is engaged. Repeat for all other nozzles, individually testing each nozzle on <br /> each side of dispenser. With each authorization, one of the green LED's on the interface <br /> module should illuminate and the VP1000 activate. <br /> - Note: For unihose dispensers, conduct individual tests for each product grade on each side <br /> of the dispener to ensure that the same LED activates for all grades on the same side. If <br /> the other LED activates, wiring needs to be corrected. <br /> - Authorize one nozzle and listen to the speed of the VP1000. With only one nozzle <br /> activated, the speed will be slower than if a nozzle on each side is activated. Activate a <br /> nozzle on the other side of the dispenser and listen for the speed to change. <br /> - To test the tightness of the vapor plumbing installed on the suction side of the system <br /> requires a 0-100" water column gauge. Connect the gauge into the 1/4" test port of the <br /> reducing tee installed earlier in section 10 Photo L. Continue by following and completing <br /> the START-UP / NEW INSTALLATION / WARRANTY /ANNUAL TESTING FORM. <br /> 8-15 <br /> CARE Approved IBM 8-Wayne Harmony Series(Assist)-Executive Orders VR-281 and VR-282 <br />
The URL can be used to link to this page
Your browser does not support the video tag.