Laserfiche WebLink
AAL <br /> ARID TECHNOLOGIES INC. <br /> PERMEATOR AT-150 Operating and Installation Manual <br /> California Air Resources Board (CARB) CP-201 Configuration <br /> Certified Under Executive Orders VR-201-Z and VR-202-Z <br /> Table of Contents <br /> Introduction <br /> PERMEATOR Systems <br /> System Components <br /> PERMEATOR System Operation <br /> System Applications <br /> Component Selection and Location <br /> AT-150 Control Panel <br /> PERMEATOR Main Cabinet <br /> Mounting Locations <br /> Installation of PERMEATOR <br /> Location <br /> Piping <br /> Electrical <br /> Installation of AT-150 Control Panel <br /> Location <br /> Conduit <br /> Electrical <br /> Communication to ISD System <br /> Vapor Piping Requirements and Installation <br /> Overall requirements <br /> Slope <br /> Between dispensers and storage tanks <br /> Between storage tanks and PERMEATOR <br /> Commissioning and Start-up of PERMEATOR on site <br /> Pressure Integrity Testing <br /> Liquid leak integrity testing <br /> Vapor to Liquid (V/L) Test <br /> Pressure control set-points <br /> Vacuum Pump Motor Rotation <br />