My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
1630
>
2300 - Underground Storage Tank Program
>
PR0518624
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/8/2021 4:48:00 PM
Creation date
2/22/2021 2:00:28 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0518624
PE
2371
FACILITY_ID
FA0024496
FACILITY_NAME
Costco Wholesale #38 (Gas Station)
STREET_NUMBER
1630
Direction
E
STREET_NAME
HAMMER
STREET_TYPE
Ln
City
Stockton
Zip
95210
APN
09428011
CURRENT_STATUS
01
SITE_LOCATION
1630 E Hammer Ln
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
763
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AAL <br /> ARID TECHNOLOGIES INC. <br /> PERMEATOR AT-150 Operating and Installation Manual <br /> California Air Resources Board (CARB) CP-201 Configuration <br /> Certified Under Executive Orders VR-201-Z and VR-202-Z <br /> Table of Contents <br /> Introduction <br /> PERMEATOR Systems <br /> System Components <br /> PERMEATOR System Operation <br /> System Applications <br /> Component Selection and Location <br /> AT-150 Control Panel <br /> PERMEATOR Main Cabinet <br /> Mounting Locations <br /> Installation of PERMEATOR <br /> Location <br /> Piping <br /> Electrical <br /> Installation of AT-150 Control Panel <br /> Location <br /> Conduit <br /> Electrical <br /> Communication to ISD System <br /> Vapor Piping Requirements and Installation <br /> Overall requirements <br /> Slope <br /> Between dispensers and storage tanks <br /> Between storage tanks and PERMEATOR <br /> Commissioning and Start-up of PERMEATOR on site <br /> Pressure Integrity Testing <br /> Liquid leak integrity testing <br /> Vapor to Liquid (V/L) Test <br /> Pressure control set-points <br /> Vacuum Pump Motor Rotation <br />
The URL can be used to link to this page
Your browser does not support the video tag.