My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
1630
>
2300 - Underground Storage Tank Program
>
PR0518624
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/8/2021 4:48:00 PM
Creation date
2/22/2021 2:00:28 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0518624
PE
2371
FACILITY_ID
FA0024496
FACILITY_NAME
Costco Wholesale #38 (Gas Station)
STREET_NUMBER
1630
Direction
E
STREET_NAME
HAMMER
STREET_TYPE
Ln
City
Stockton
Zip
95210
APN
09428011
CURRENT_STATUS
01
SITE_LOCATION
1630 E Hammer Ln
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
763
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CARB Approved IOM 12 - ARID Permeator AT-150 -VR-201-Z /VR-202-Z <br /> Vehicle Vapor Recovery System—Phase (Stage) II System <br /> For AT-150 installations, the front-end vapor recovery hanging hardware is supplied and <br /> tested by others. Only Phase (Stage) II hanging hardware listed for use on the Assist <br /> Phase II EVR Executive Order VR-202 Series is permitted in California. <br /> Electrical Control Panel <br /> The electrical control panel should be checked for proper wiring, accessibility and indoor <br /> location. Explosion proof conduit,junction boxes and seals should be used within the <br /> classified area. <br /> System should be cycled between P hi and P to to ensure proper operation. Run time <br /> meter should be referenced with detailed pressure vs. time data to verify proper system <br /> response. <br /> Instructions to Site Operating Personnel <br /> Station employees should receive instructions on checking panel plc, run time meter and <br /> indicator lights. They should be able to interpret the diagnostics and reference a <br /> Frequently Asked Question sheet which explains the impact of the system diagnostics. If <br /> the unit is stopped and cannot be restarted by following prescribed instructions, the <br /> station personnel should be instructed to call ARID or a local representative for technical <br /> support. The station personnel should also know how to use the main power interrupt <br /> feature on the electrical control panel as well. Station management should also be <br /> instructed to relay proper filling and balancing procedures to tanker truck drivers. By <br /> following proper procedures, the pressure integrity of the station vapor connections will <br /> be maintained. The closed system will allow PERMEATOR to be properly actuated and <br /> provide both economic and environmental benefits to the end-user. A copy of this <br /> manual should be kept on file at the station site. <br /> 14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.