My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
1630
>
2300 - Underground Storage Tank Program
>
PR0518624
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/8/2021 4:48:00 PM
Creation date
2/22/2021 2:00:28 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0518624
PE
2371
FACILITY_ID
FA0024496
FACILITY_NAME
Costco Wholesale #38 (Gas Station)
STREET_NUMBER
1630
Direction
E
STREET_NAME
HAMMER
STREET_TYPE
Ln
City
Stockton
Zip
95210
APN
09428011
CURRENT_STATUS
01
SITE_LOCATION
1630 E Hammer Ln
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
763
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CARB Approved IOM 12 - ARID Permeator AT-150 - VR-201-Z / VR-202-Z <br /> Overall Tank Detail <br /> Feed to PERMEATOR (From PREM Tank) <br /> Rich Vapor Return From PERMEATOR(To !ow Grade Tank), located farthest away <br /> Tank Vapor Spaces are <br /> Manifold Underground <br /> Premium Grade Tank Low Grade Tank <br /> ARID Technologies, Inc. A9111h. ARIDTECHNOLOGES�INC. XOG <br /> www.ARIDtech.com : 630.681.8500 <br /> PERMEATOR Installation <br /> • Mounting of PERMEATOR with four(4) lugs into cement slab <br /> • PERMEATOR must be perfectly level (Oil level limit switch) <br /> • 3/4 inch conduit for power wires (208 v, 3 phase, 60 Hz) <br /> • 1 inch conduit for communication wires (24 v dc) <br /> • PN valves are 2 or 3 inch NPT threads—vent pipes should be threaded <br /> accordingly. <br /> • After all piping and electrical conduit connections are made, a pressure decay test <br /> must be conducted before start-up and commissioning of PERMEATOR. <br /> Pressure decay test uses nitrogen gas and starting pressure of 2 inches H2O, <br /> gauge. (Reference CARB procedure TP-201.3) <br /> • If data logging option is chosen, internet jack is located in close proximity to <br /> control panel <br /> 17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.