Laserfiche WebLink
VR-202-Z -9 Exhibit 2 <br /> Phase I System <br /> The Phase I system shall be a CARB-certified system that demonstrates <br /> compliance with the static pressure decay test criteria contained in the <br /> latest version of TP-201.3. <br /> Maintenance and Alarm History Records <br /> 1. Each GDF operator/owner shall keep records of maintenance performed at the <br /> facility. Such records shall be maintained on site or in accordance with district <br /> requirements or policies. The records shall include the maintenance or test <br /> date, repair date to correct test failure, maintenance or test performed, affiliation, <br /> telephone number, name and Certified Technician Identification Number of <br /> individual conducting maintenance or test. Additional information may be <br /> required in accordance with local district requirements. <br /> Each GDF operator/owner shall keep records of all alarms detected by the ISD <br /> system. Alarm History records shall be maintained on site or in accordance with <br /> district requirements or policies. The records shall include the alarm date, the <br /> nature of the alarm, type of test and test date to verify the validity of ISD alarm, <br /> maintenance or repair date to correct the cause of the alarm, maintenance or <br /> repair performed to correct the cause of the alarm, affiliation, telephone number, <br /> name and Certified Technician Identification Number of individual conducting <br /> maintenance or test. Additional information may be required in accordance with <br /> local district requirements. <br /> An example of a GDF Maintenance and Alarm History Record is shown in <br /> Figure 2-13. <br /> 2. Maintenance shall be conducted in accordance with Scheduled Maintenance <br /> document in CARB Approval Installation, Operation and Maintenance <br /> Manual. <br /> 3. Reconnection of breakaways shall be included in the maintenance records. <br />