My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2017
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FREWERT
>
916
>
4400 - Solid Waste Program
>
PR0526865
>
COMPLIANCE INFO_2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2024 12:27:30 PM
Creation date
2/23/2021 3:03:36 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
2017
RECORD_ID
PR0526865
PE
4443
FACILITY_ID
FA0018195
FACILITY_NAME
CENTRAL VALLEY COMPOST
STREET_NUMBER
916
Direction
W
STREET_NAME
FREWERT
STREET_TYPE
RD
City
LATHROP
Zip
95330
APN
19126022
CURRENT_STATUS
01
SITE_LOCATION
916 W FREWERT RD
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
328
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br />SULID WASTE FACILITY PERMIT Facility Number: <br />0051 <br />6. Windrows, feedstock, finish compost and overs shall be maintained to prevent the attraction or establishment of flies. rats or <br />other vectors in the compost. <br />7. All piles onsite shall be monitored at multiple points for internal temperature to prevent fires and achieve pathogen reduction. <br />8. All incoming materials must be immediately spread out for manual screening. The materials may then be stockpiled after the <br />manual scrrening. Unacceptable materials found in the stockpiled will be considered a violation of the hazardous waste <br />screening program. <br />9. USB and particle beard that will be composted must be processed with the greenwaste and evenly distributed. I'he amount of <br />OSB and particle board mixed with the greenwaste must be no more than 5% by volume. <br />10. Facility is receiving wood waste along with green waste. The wood waste is separated and placed in a pile. The wood waste <br />is ground, stored, and taken to a facility to be used for energy. According to Title 14 CCR. Section 17381 (cc). the facility <br />can not receive, process or remove more than 25 tons per day of the wood waste from the compost site. This activity is <br />considered the CUI debris processing operation. <br />11. Site shall not accept commercial food waste, manure, or animal carcasses. Food waste brought in as feedstock must be <br />limited to co -collected green and food waste off residential routes. The amount of foodwaste mixed with the greenwaste must <br />not be more than 15% by volume. <br />Page 5 of 5 <br />»� <br />
The URL can be used to link to this page
Your browser does not support the video tag.