My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
1490
>
2300 - Underground Storage Tank Program
>
PR0541436
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/30/2022 8:50:05 AM
Creation date
2/25/2021 2:28:30 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0541436
PE
2351
FACILITY_ID
FA0023750
FACILITY_NAME
AGS FUEL INC DBA CIRCLE K CHEVRON
STREET_NUMBER
1490
Direction
S
STREET_NAME
MAIN
STREET_TYPE
ST
City
MANTECA
Zip
95337
CURRENT_STATUS
01
SITE_LOCATION
1490 S MAIN ST
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The following is an itemized list of underground storage tank violations that have not <br /> been addressed for AGS FUEL INC DBA CIRCLE K CHEVRON as of September <br /> 15 , 2021 . <br /> Open violations from March 30 , 2021 inspection <br /> Violation #122 - Failure to implement corrections and submit written response within 30 days of receiving <br /> the report. <br /> OBSERVATION : An inspection was last done on 3/3/2020 and an inspection report was issued identifying <br /> information to be submitted to bring this site into compliance . This information was required to be submitted by <br /> 4/2/2020 . This information was submitted on 6/8/2020 , 67 days late . <br /> REGULATION GUIDANCE : An operator that receives an inspection report shall have 30 days to implement the <br /> corrections specified in the inspection report and comply with permit conditions . The corrective action shall include <br /> all of the recommendations made in the report. The operator shall submit a written response that includes a <br /> statement documenting corrective actions taken or proposing corrective actions which will be taken . <br /> CORRECTIVE ACTION : Ensure that a written response documenting corrective actions taken or proposed is <br /> submitted and all corrections implemented within 30 days of receiving an inspection report. <br /> ❑ This violation was corrected ❑ This violation will be corrected by ( date) : <br /> ❑ Supporting documents included <br /> Describe actions taken or will be taken to correct violation : <br /> Violation #307 - Failure to keep water out of the secondary containment system ( post-Jul 2003) . <br /> OBSERVATION : Water was found in the 91 fill sump . <br /> REGULATION GUIDANCE : Secondary containment shall be constructed to prevent any water intrusion into the <br /> system by precipitation , infiltration , or surface runoff. <br /> CORRECTIVE ACTION : The service technician removed approximately 5 gallons of liquid from the 91 sump and <br /> returned the sensor to its proper location . Immediately contact a properly licensed , trained , and certified contractor <br /> to address the water intrusion into the 91 fill sump under permit and inspection of the EHD . <br /> ❑ This violation was corrected ❑ This violation will be corrected by (date) : <br /> ❑ Supporting documents included <br /> Describe actions taken or will be taken to correct violation : <br /> Page 1 of 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.