My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
1210
>
2300 - Underground Storage Tank Program
>
PR0231125
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/2/2022 10:59:52 AM
Creation date
2/25/2021 4:41:57 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0231125
PE
2361
FACILITY_ID
FA0003730
FACILITY_NAME
TIWANA GAS & FOOD
STREET_NUMBER
1210
Direction
E
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95210
APN
09403012
CURRENT_STATUS
01
SITE_LOCATION
1210 E HAMMER LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FvwAw�- Oe-�,f*r Sellfs <br /> WC�VWAC-t C�C,5 <br /> Maintenance Inspecting/Verifying 95% Level (Without <br /> The 708-590 Series Overfill Prevention Valve has no Removing from Tank) <br /> periodic maintenance requirements. FOR DIMENSIONS,:A" &"B": Refer to the"installation <br /> However, if the drop tube and valve assembly is removed record sheet" or re-measure and re-calculate per figure 1 <br /> from the tank (for inspection or service), inspect the <br /> drop tube seal for wear/damage (Figure 16). Replace if 1. Measure Dimension "Z" (Figure 18) <br /> necessary (Upper drop tube flange to <br /> edge of upper tube adapter) <br /> 2. Verify using the calculation below <br /> eat surface if.) <br /> (Drop tube s <br /> bottom of tank) <br /> (Subtract) <br /> Drop Tube Gasket Installed "B" (95%Volume from tank chart) <br /> (note orientation) <br /> (Subtract) <br /> (95%Shutoff level offset) <br /> ...... (1 1 4mm) <br /> Figure 16:Inspect Gasket (Equals) <br /> Additionally, if the upper or lower drop tube is <br /> unthreaded;removed from the OPV,the O-ring(s)should D <br /> be replaced (Figure 17), 7Same value as 'T' <br /> indicates correct installation <br /> Inspect 0-ring <br /> ---------- <br /> Measure <br /> j <br /> 4112, <br /> (114 mm) <br /> Inspect 0-ring <br /> Figure 17:inpect O-Rings Figure 18:Dimension Verification After Installation <br />
The URL can be used to link to this page
Your browser does not support the video tag.