My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
1210
>
2300 - Underground Storage Tank Program
>
PR0231125
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/2/2022 10:59:52 AM
Creation date
2/25/2021 4:41:57 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0231125
PE
2361
FACILITY_ID
FA0003730
FACILITY_NAME
TIWANA GAS & FOOD
STREET_NUMBER
1210
Direction
E
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95210
APN
09403012
CURRENT_STATUS
01
SITE_LOCATION
1210 E HAMMER LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SANJ O A Q U I N Environmental Health Department <br /> - C O U N T Y ---- <br /> UST SYSTEM RETROFIT OR REPAIR <br /> ( Submit minimum of 3 sets of plans & applications as originals will be retained by EHD ) <br /> 1 . Site map enclosed ? YES ❑] NO ❑ <br /> 2 . Submit copies of ICC Service Technician and/or Installer' s certificate and all manufacturer training certificates <br /> for each person installing or testing any component that is repaired or replaced . Ensure a copy ofthe " Site <br /> Health and Safety Plan " is available on the jobsite as required by Title 8 . <br /> 3 . Detailed description of work to be completed . List components to be repaired or replaced and attach a diagram <br /> drawn to scale showing location of repairs and/or replacements . If repairing a component, describe how this <br /> will be done . ( If adding piping , UDC ' s , or other UST equipment, or performing tank top upgrade , use the UST <br /> Installation Application pages 4- 8 as necessary for a timely plan review) : <br /> Cut out and break out 3 ' x3 ' area of concrete to e spill buckets (this work is to be done on <br /> both the 87 and 91 ) . Remove and ins w ( 5 ) gallon OPW 1200 (5) gallon direct bury cast <br /> iron spill bucket . Backfill and ce concrete with 2500 psi 5 sack mix with broom finish . <br /> Submit passing test s to CUPA <br /> 4 . List of equipment to be used (Attach manufacturer' s specification sheets showing third - party approval ) : <br /> (5) Gallon OPW direct bury cast iron spill bucket- Part # 1 C-2100C- DEVR <br /> 5 . Decontamination Procedures : <br /> a . Will piping be decontaminated prior to removal ? YES NOR <br /> b . Identify contractor performing decontamination : <br /> Name Phone ( ) <br /> Address City Zip <br /> 3 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.