Laserfiche WebLink
2'oPauiN c 'Gy SAN J O A Q U I N Environmental Health Department <br /> Q: i� <br /> COUNTY Jasjit Kang , REHS , Director <br /> °9CiFoa `P <br /> Greatness grows here . Muniappa Naidu, REHS , Assistant Director <br /> PROGRAM COORDINATORS <br /> Robert McClellon , REHS <br /> Jeff Carruesco , REHS , RDI <br /> Willy Ng , REHS <br /> Melissa Nissim , REHS <br /> Steven Shih , REHS <br /> September 2 , 2021 <br /> Sarah Jablonsky <br /> Walton Engineering , Inc . <br /> PO Box 1025 <br /> West Sacramento , CA 95691 <br /> Re : 7 - Eleven #32262 SR0084151 <br /> 2360 W Grant Line Rd . , Tracy , CA 95377 <br /> The San Joaquin County Environmental Health Department ( EHD) has completed the review of the <br /> application for a permit to do the following on the underground storage tank ( UST) system at the above <br /> noted address : <br /> • replace the 87 , 89 , and 91 spill containers and manways <br /> • replace the 87 , 89 , and 91 drop tube with shut- off valve (flapper) <br /> The permit has been approved with the following conditions : <br /> 1 . Contact the local fire department and the San Joaquin Valley Air Pollution Control District for <br /> any applicable permits and requirements . <br /> 2 . Any changes in information and scope of work must be submitted to EHD for approval prior to <br /> commencing work . All new addenda supersede the previous ones . <br /> 3 . Provide written notification to ust( slgov . org to arrange the following inspection appointments <br /> ( a 48- hour notice is required for inspection appointments ) . <br /> a . Spill bucket test : Verify minimum 5 - gallon capacity and pass a one hour hydrostatic test ( or <br /> equivalent) . Proper drainage must also be verified . <br /> b . Overfill prevention verification : Measurement of drop tubes to verify 95 % tank volume shut <br /> off. Verification of flapper functionality . Ensure that all pertinent tank charts and <br /> calculations are available for review at the time of inspection . <br /> c . Verification that ball float (s ) , if installed , do not interfere with the installed flapper valve . <br /> d . Since concrete will be broken near the 87 , 89 , and 91 tanks , a secondary containment test <br /> must be performed on the 87 , 89 , and 91 tanks once concrete is poured in accordance with <br /> the manufacturer' s guidelines . <br /> Please be aware that the facility cannot receive fuel in the 87 , 89 , and 91 tank prior to the <br /> EHD inspection and approval . <br /> 4 . Any individual performing the work of a service technician must meet the following <br /> qualifications : <br /> a . Possess or be employed by a person who possesses one of several permissible valid , <br /> current contractor' s licenses issued by the Contractors State License Board ( may be issued <br /> to the installation company) , or a Tank Tester' s license issued to the individual by the State <br /> Water Board <br /> 1868 E . Hazelton Avenue Stockton , California 95205 1 T 209 468-3420 1 F 209 464- 0138 1 www . sjgov . org /ehd <br />