My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
2360
>
2300 - Underground Storage Tank Program
>
PR0507204
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/29/2024 12:47:48 PM
Creation date
2/25/2021 4:42:47 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0507204
PE
2361
FACILITY_ID
FA0007735
FACILITY_NAME
7-ELEVEN INC #32262
STREET_NUMBER
2360
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
23819001
CURRENT_STATUS
01
SITE_LOCATION
2360 W GRANT LINE RD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
139
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WALTON <br /> ENGHNEERRNG � n <br /> Scope of Work <br /> 7 = Eleven #32262 <br /> 2360 W . Grant Line Rd . <br /> Tracy, CA <br /> The general scope of work is to supply labor for the installation of new OPW Multi- Port <br /> Retrofit Kits with new spill containers at this location , material and equipment as <br /> needed , including but not limited to the following ; <br /> Scope of Work, <br /> • Obtain and pay for the CUPA permit required for this work . <br /> • Sawcut , remove and dispose of a 7 ' x7 ' area of concrete at each of three ( 3 ) <br /> UST fill manways . <br /> • Remove and dispose of the existing manways and spill containers . <br /> • Modify the existing 4 " steel fill and vapor risers to accommodate the new spill <br /> containers . <br /> • Install all Source NA furnished manways , tophats , spill containers , caps , adapters <br /> and drop tubes . <br /> • Cut down existing FRP sump as required and custom fit the new tophat unit to <br /> the fill sump . <br /> • Backfill and restore all concrete removed for this work . <br /> • Obtain all COPA inspections and provide all CUPA and Air Quality testing . <br /> Equipment : <br /> ( 3 ) OPW FiberTite Multi - Port Retrofit Kit ( 87 , 89 , 91 ) <br /> ( 3 ) 61 SALP - 1020- EVR OPW 4 " swivel fill adapters <br /> ( 3 ) 63477085- EVR OPW 4 " fill caps <br /> ( 3 ) 61 VSA- 1020 EVR OPW Swivel Vapor adapters <br /> ( 3 ) 1711T- 7085- EVR OPW 4 " Vapor caps <br /> ( 6 ) FSA-400S OPW face seal adapters <br /> ( 3 ) OPW Overfill Drop Tube <br /> 3960 Commerce Drive , iVest Sacramento , GA 95691 M W 372 1888 i ax 373 - 1 1 72 <br /> Mailing Address : PO . Bwx 1025 , W M Sacramento , CA 95691 <br />
The URL can be used to link to this page
Your browser does not support the video tag.