My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
2360
>
2300 - Underground Storage Tank Program
>
PR0507204
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/29/2024 12:47:48 PM
Creation date
2/25/2021 4:42:47 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0507204
PE
2361
FACILITY_ID
FA0007735
FACILITY_NAME
7-ELEVEN INC #32262
STREET_NUMBER
2360
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
23819001
CURRENT_STATUS
01
SITE_LOCATION
2360 W GRANT LINE RD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
139
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tank <br /> Monitoring System Certification Form <br /> 1. LINE LEAK DETECTOR TESTING <br /> LJ Check this box if line leak detectors ARE NOT installed. (Do not complete this section.) <br /> Simulated release rate verified: (Check all that apply.) Yes Na I <br /> ® 3 GPH LJ 0.1 GPH Ll 0.2 GPH <br /> Has the testing apparatus been properly calibrated? <br /> For emergency generator tank systems, does the LLD create an audible and visual <br /> alarm when a leak is detected? <br /> For mechanical LLDs, does the LLD restrict the flaw through the pipe when a ® D El <br /> release is detected? <br /> For electronic LLDs, does the turbine automatically shut off when a release is <br /> detected? <br /> For electronic LLDs, does the turbine automatically shut off if any portion of the <br /> monitoring system is disabled or disconnected? <br /> For electronic LLDs, does the turbine automatically shut off if any portion of the LJ J V <br /> monitoring system malfunctions or fails a tightness test? <br /> For electronic LLDs, have all accessible wiring connections been visually inspected 1j <br /> for kinks and breaks? <br /> Were all items on the equipment manufacturer's maintenance checklist completed? ® Ll El <br /> Were all LLDs confirmed operational within regulatory requirements? R1 D Ej <br /> LLD ID LLD Madel Limes Monitored ,Pass Fail <br /> T4 LD-2000 RUL.PROD.LINE ® 0 <br /> T5 LD-2000 MUL.PROD.LINE ® 11 <br /> T6 LD-2000 PUL.PROD.LINE ® 0 <br /> Ll Ll <br /> Ll Ij <br /> Il Ij <br /> Ll U <br /> L1 Li <br /> L] Ll <br /> 11 D <br /> El I1 <br /> I, I, <br /> Describe all answers marked "No"or"Fail'and proposed remedy it Section 9. <br /> List all monitoring equipment either replaced or repaired in Section 9 <br /> Page 4 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.