Laserfiche WebLink
LEAK. TEST METHOD OUTPUT RELA`,' SETUP <br />TEST L',N DriTE ALL TAI'41: <br />.TAN 1. 1996 R 1:87 SOUTH <br />START TIME D I iABLFD T'ZPE : <br />TEST RATE : 0 .20 COAL • HE PUMP CONTROL OUTPUT <br />DURHT I ON U HoURL TANK #: 1 <br />TBT EHRLY Sl'oP : D 1 ,ABLED <br />LIQUID SENSOR: r LHS <br />LEAP TEST REPORT FORMAT L I:FUEL ALARI'l <br />NORMAL L :FLIEL ALARM <br />L 1:SENSOR iMUT HLARIJ <br />L 2:SENSOR OUT ALARM <br />L 1:9HORT ALARM <br />L 2:SHORT ALARM <br />ISD SITE r Lt=;RMS <br />ISD GROSS PRES FAIL <br />ISD DEGRD PRES FOIL <br />I SD % APOR LEAK FAIL <br />I :SD 'v T' FRES FAIL <br />ISD VP, ;STATUS FAIL <br />LIQUID SENSOR SETUP ISD SENSOR OUT FAIL <br />SI'9(aRTSENSC)k SET'UF' <br />1 : D 18:P 1 FLOW <br />f-'ATEtX)R'¢ Fi I R FLOP J DIETER <br />s 2: D 1 SP 3-4 FLi-A:.l <br />CATEt,OR'Y AIR FLOW METER <br />W .� : PRESSURIE <br />CATEGORY VAPOR PRESS'UR'E <br />s 4:VAPOR VALVE <br />CATEGORY VAPOR VALVE <br />8: ATM P <br />C'ATEWR`! HTM P SENSOR <br />EVR ISIS SETUP <br />EVR TYPE: BALAISlC'E <br />BALANCE NOZZLE TYPE <br />VST <br />VAPOR PROCESSOR TYPE <br />VEEIiER-ROOT POL l :_ HER <br />ANALYSIS TIMES <br />TIME: 10:00 AM <br />DELAY MINUTES: 1 <br />ISD HOSE HLHRMS <br />L 1 :87 STP SUMP SOUTH <br />ALL : FL%,I COLLECT FAIL: <br />TRI-STATE (S I NGLE FLOAT.) <br />CATEGORY . STP SUMP <br />R 2:817 NORTH <br />TYPE: <br />PUMP C'ONT'ROL OUTPUT <br />L 2:87 STP SUMP NORTH <br />TANK 9: 2 <br />TR I --STATE (S I Nr: LE FLOAT) <br />CATEGORY : STP SUMP <br />LIQUID :SENSOR ALI" 1S <br />L 1:FUEL ALARM <br />L 3:91 STP SUMP <br />L 2:FUEL ALARM <br />TRI-STATE s:SINGLE FLOAT) <br />L 1:SENSOR OUT ALARM <br />CATEGORY : STP SUMP <br />L 2:5ENSOR OUT ALARM <br />L !:SHORT ALARM <br />L 2:SHORT ALARM <br />L 4:87 ANNULAR <br />TRI --STATE (SINGLE FLOAT) <br />ISD SITE ALARMS <br />CATEGORY : ANNULAR SPHCE <br />I SD GROSS PRES FAIL <br />ISD DEGRD PRES FAIL <br />ISD VAPOR LEAK FAIL <br />ISD VP PRES FAIL <br />L 5:89 ANNULAR <br />ISD VP STATUS FAIL <br />TRI-STATE (SINGLE FLOAT) <br />ISD SENSOR OUT FAIL <br />CATEGORY : ANNULAR SPACE <br />ISD HOSE ALARMS <br />ALL:FLOW GULLET:T FAIL <br />L 6:91 AI'-JNULAR <br />R 3:91 <br />TRI-STATE (SINGLE FLOAT) <br />T`,'PE: <br />CATEGORY : ANNULAR SPACE <br />STANDARD <br />NORMALL"CLOSED <br />TANK #: 3 <br />LIQUID SENSOR ALMS <br />L ::FUEL ALAR!"! <br />L 3:SENSOR OUT ALARM <br />L 3:SHORT ALARM <br />ISD SITE ALARMS <br />ISD GROSS � FRES FAIL <br />113D DEGRD PRES FAIL <br />P IJV,W' ;SENSOR SETUP <br />ISD VAPOR LEAK FOIL <br />- - - - - - - - - - - <br />ISD VP PRES FAIL <br />ISD VP :STATUS FAIL <br />2� 1:Unleaded-Re•!ular- <br />ISD SENSOR OUT FAIL <br />TAN} V: I <br />D I SPENEZ MODE: <br />ISD HOSE ALARMS <br />MAN I FOLDED : ALL PUMPS <br />ALL : FLOW COLLECT FAIL. <br />SI'9(aRTSENSC)k SET'UF' <br />1 : D 18:P 1 FLOW <br />f-'ATEtX)R'¢ Fi I R FLOP J DIETER <br />s 2: D 1 SP 3-4 FLi-A:.l <br />CATEt,OR'Y AIR FLOW METER <br />W .� : PRESSURIE <br />CATEGORY VAPOR PRESS'UR'E <br />s 4:VAPOR VALVE <br />CATEGORY VAPOR VALVE <br />8: ATM P <br />C'ATEWR`! HTM P SENSOR <br />EVR ISIS SETUP <br />EVR TYPE: BALAISlC'E <br />BALANCE NOZZLE TYPE <br />VST <br />VAPOR PROCESSOR TYPE <br />VEEIiER-ROOT POL l :_ HER <br />ANALYSIS TIMES <br />TIME: 10:00 AM <br />DELAY MINUTES: 1 <br />