My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
R
>
ROTH
>
116
>
2300 - Underground Storage Tank Program
>
PR0523684
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/21/2022 8:11:54 AM
Creation date
3/3/2021 11:49:16 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0523684
PE
2351
FACILITY_ID
FA0015977
FACILITY_NAME
Fast Lane Central Valley
STREET_NUMBER
116
STREET_NAME
ROTH
STREET_TYPE
Rd
City
Lathrop
Zip
95330
APN
196-02-020
CURRENT_STATUS
01
SITE_LOCATION
116 Roth Rd
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
133
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tank <br /> Overfill Prevention Equipment Inspection Report <br /> 6. OVERFILL PREVENTION EQUIPMENT DETAILS <br /> Tank ID (one OPE per column) T1-1 diesel south T2-2 diesel <br /> Are both vent and tank riser piping ® Yes ® Yes ❑ Yes ❑ Yes <br /> secondarily contained? ❑ No ❑ No ❑ No ❑ No <br /> OPE Model Mag 7 Mag? <br /> What is the OPE response when activated? 0 Shut off 9 Shut off ❑ Shut off ❑ Shut off <br /> (Check all that apply.) Flow Flow Flow Flow <br /> ❑Restricts ❑Restricts ❑Restricts ❑Restricts <br /> Flow Flow Flow Flow <br /> 0 Audible 0 Audible ❑ Audible ❑ Audible <br /> Alarm Alarm Alarm Alarm <br /> 0 Visual 0 Visual ❑ Visual ❑ Visual <br /> Alarm Alarm Alarm Alarm <br /> Are flow restrictors installed on vent piping ® Yes* ® Yes* ❑ Yes* ❑ Yes* <br /> that may interfere with the OPE operation? ❑ No ❑ No ❑ No ❑ No <br /> At what level in the tank is the OPE set to 100" 100" <br /> activate? (Inches from bottom of tank) <br /> What is the percent capacity of the tank at 90% 90% <br /> which the OPE activates? <br /> Is the OPE in proper operating condition to ❑ Yes ❑ Yes ❑ Yes ❑ Yes <br /> respond when the stored substance ® No ® No ❑ No ❑ No <br /> reaches the designated regulatory level? <br /> 7. SUMMARY OF TESTING RESULTS <br /> El Pass ❑ Pass El Pass EJPass <br /> OPE Inspection Results 0 Fail 0 Fail ❑ Fail ❑ Fail <br /> 8. COMMENTS <br /> Describe all results marked "Fail"and each proposed remedy. <br /> Audio visual outside did not work but came in on the TLS.Also changed bulb already but still didn't work. <br /> * Mark here if: <br /> ❑ Flow restrictors interfere with overfill prevention and equipment repairs required. <br /> Additional copies of this page may be attached. <br /> Attach tank chart(s), measurements, calculations, and In-Tank Setup report(s) <br /> Page 2 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.