Laserfiche WebLink
Attachment B B-6 <br /> Reissued Waste Discharge Requirements General Order No. R5-2013-0122 <br /> Existing Milk Cow Dairies <br /> 2. Existing facilities in operation on or before November 27, 1984 that are <br /> protected against 100-year peak storm flows will continue such <br /> protection; or <br /> 3. Facilities, or portions thereof, which began operation after November <br /> 27, 1984, are protected against 100-year peak storm flows. <br /> B. For facilities in the Tulare Lake Basin showing if the facility is protected from <br /> overflow from stream channels during 20-year peak stream flows for facilities <br /> that existed as of 25 July 1975 and protected from 100-year peak stream <br /> flows for facilities constructed after 25 July 1975. Facilities expanded after 8 <br /> December 1984 must be protected from 100-year peak stream flows. <br /> C. If the facility's flood protection does not meet these minimum requirements, <br /> the WMP shall include proposed modifications or improvements with the <br /> corresponding design to achieve the necessary flood protection and a <br /> schedule for construction and certification of completion to comply with the <br /> Schedule of Tasks J.1 of Waste Discharge Requirements General Order No. <br /> R5-2013-0122. <br /> IV. A report assessing if the animal confinemenbreas, animal housing, and manure <br /> and feed storage areas are designed and constructed properly. <br /> A. The report shall assess ifhe following design and construction criteria are <br /> met: <br /> 1. Corrals and/or pens are designed and constructed to collect and divert <br /> all process wastewater to the retention pond; <br /> 2. The animal housing area (i.e., barn, shed, milk parlor, etc.) is designed <br /> and constructed to divert all water that has contacted animal wastes to <br /> the retention pond; and <br /> 3. Manure and feed storage areas are designed and constructed to collect <br /> and divert runoff and leachate from these areas to the retention pond. <br /> B. If thEfacility does not meet the above design and construction criteria, the <br /> WMP shall include proposed modifications or improvements to achieve the <br /> criteria and a schedule for construction and certification of completion to <br /> comply with the Schedule of Tasks J.1 of Waste Discharge Requirements <br /> General Order No. R5-2013-0122. <br />