|
<br />PA-1800315 – Conditions of Approval 1
<br />CONDITIONS OF APPROVAL
<br />PA-1800315
<br />VANDER SCHAAF DAIRY #3 / PROVOST & PRITCHARD / STEVE BOMMELJE
<br />
<br />Site Approval Application No. PA-1800315 was approved by the Planning Commission on August 5,
<br />2021. The effective date of approval is August 15, 2021. This approval will expire on February 15, 2023,
<br />which is 18 months from the effective date of approval, unless (1) all Conditions of Approval have been
<br />complied with, (2) all necessary building permits have been issued and remain in force, and (3) all
<br />necessary permits from other agencies have been issued and remain in force.
<br />
<br />Unless otherwise specified, all Conditions of Approval and ordinance requirements shall be fulfilled
<br />prior to the establishment of the use and the issuance of any building permits. Those Conditions
<br />followed by a Section Number have been identified as ordinance requirements pertinent to this
<br />application. Ordinance requirements cannot be modified, and other ordinance requirements may
<br />apply.
<br />
<br />1. COMMUNITY DEVELOPMENT DEPARTMENT (Contact: [209] 468-3121)
<br />
<br />a. BUILDING PERMIT: Submit an "APPLICATION-COMMERCIAL BUILDING PERMIT". The Site
<br />Plan required as a part of the building permit must be prepared by a registered civil engineer or
<br />licensed architect. This Plan must show drainage, driveway access details including gates, on-site
<br />parking, landscaping, signs, existing and proposed utility services, and grading (refer to the "SITE
<br />PLAN CHECK LIST" for details). Foundation and soils investigation shall be conducted in
<br />conformance with Chapter 18 of the California Building Code at the time of permit application. A
<br />fee is required for the Site Plan review. (Development Title Section 9-884)
<br />
<br />b. APPROVED USE: This approval is for a manure digester operation to be completed in 18 months
<br />as shown on the Revised Site Plan dated May 21, 2021. The facility will process manure from both
<br />onsite and offsite dairies, and includes the construction of the following: (Use Type: Agricultural
<br />Wastes)
<br />
<br /> 11,825-square-foot hydrolyzer structure,
<br /> 57,600-square-foot digester double-lined covered lagoon,
<br /> 5,100-square-foot Livestock Water Recycling structure,
<br /> 3,200-square-foot office building,
<br /> 1,500-square-foot utility shop,
<br /> 5,500-square-foot Livestock Water Recycling equipment area,
<br /> 11,000-square-foot Renewable Natural Gas equipment area,
<br /> 2,760-square-foot processing and equalization pit,
<br /> 7,850-square-foot flare structure,
<br /> 1,370-square-foot truck scale,
<br /> Three natural gas genset containers totaling 1,400 square-feet,
<br /> 144-square-foot collection pit,
<br /> 1,990-square-foot flush pit,
<br /> 2,700-square-foot manure screen separation structure,
<br /> 1,900-square-foot bedding drying structure, and
<br /> temporary manure storage area.
<br />
<br />c. CAPITAL FACILITY FEE: This project may be subject to the Capital Facility Fee. If the Capital
<br />Facility Fee is applicable, the County shall collect the fees before the issuance of any building
<br />permits. (Development Title Section 9-1245.2)
<br />
<br />
|