My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0013917
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MURPHY
>
13773
>
2600 - Land Use Program
>
PA-1800315
>
SU0013917
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/23/2021 1:18:23 PM
Creation date
3/4/2021 8:02:54 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0013917
PE
2631
FACILITY_NAME
PA-1800315
STREET_NUMBER
13773
Direction
S
STREET_NAME
MURPHY
STREET_TYPE
RD
City
ESCALON
Zip
95320-
APN
20312011
ENTERED_DATE
2/10/2021 12:00:00 AM
SITE_LOCATION
13773 S MURPHY RD
RECEIVED_DATE
4/8/2021 12:00:00 AM
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\tsok
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
254
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Reissued Waste Discharge Requirements General Order No. R5-2013-0122 <br /> Existing Milk Cow Dairies <br /> Table 1. Schedule for Submittal of Existing Conditions Report, Waste Management Plan, Nutrient Management Plan, <br /> Salinity Report, Preliminary Infrastructure Needs Checklist, and Annual Reports <br /> Professional <br /> Due Date Submittal Due Contents of Submittal Certification <br /> Requirements <br /> Identification of Backflow Problems Identify backflow problems with proposed Trained Professional** <br /> remediation and schedule. <br /> Proposed interim facility modifications (e.g., <br /> recycling flush water, diverting roof runoff, <br /> Proposed Interim Facility Modifications as resizing nozzles, removing pond solids, etc.) <br /> Necessary to Improve Storage Capacity that can be completed within the next 12 None <br /> months to decrease storage capacity needs or <br /> increase existing storage capacity, with <br /> 1 July 2008 schedule to implement proposed modifications <br /> within 12 months. <br /> Proposed interim facility modifications (e.g., <br /> acquiring more cropland, exporting more <br /> Proposed Interim Facility Modifications as wastes, reducing herd size, etc.)that can be <br /> Necessary to Balance Nitrogen completed within 12 months to balance the None <br /> nitrogen generated and imported with the <br /> nitrogen removed by crops and exported, with <br /> schedule to implement proposed modifications <br /> within 12 months. <br /> Field Risk Assessment— Evaluate the <br /> Statement of Completion of Item V of effectiveness of management practices to None <br /> Attachment C (Nutrient Management Plan)* control waste discharges from land application <br /> 31 December 2008 areas. <br /> Identification of infrastructure changes needed <br /> Preliminary Infrastructure Needs Checklist to properly manage wastes (e.g., piping, None <br /> pumps, meters, etc.). <br /> 32 <br />
The URL can be used to link to this page
Your browser does not support the video tag.