My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0013917
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MURPHY
>
13773
>
2600 - Land Use Program
>
PA-1800315
>
SU0013917
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/23/2021 1:18:23 PM
Creation date
3/4/2021 8:02:54 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0013917
PE
2631
FACILITY_NAME
PA-1800315
STREET_NUMBER
13773
Direction
S
STREET_NAME
MURPHY
STREET_TYPE
RD
City
ESCALON
Zip
95320-
APN
20312011
ENTERED_DATE
2/10/2021 12:00:00 AM
SITE_LOCATION
13773 S MURPHY RD
RECEIVED_DATE
4/8/2021 12:00:00 AM
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\tsok
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
254
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MONITORING AND REPORTING PROGRAM No. R5-2013-0122 MRP-7 <br /> GENERAL ORDER FOR EXISTING MILK COW DAIRIES <br /> shall be conducted at the frequency and for the parameters specified in Table 4 <br /> below. The frequency of monitoring the domestic and agricultural supply wells for <br /> ammonium nitrogen and total dissolved solids may be reduced to every five years <br /> after two years of data are provided to the Executive Officer. <br /> Table 4. GROUNDWATER MONITORING <br /> Domestic and Agricultural Supply Wells <br /> Annually: <br /> Field measurements of electrical conductivity and ammonium nitrogen'. <br /> Laboratory analyses of nitrate-nitrogen. <br /> Every five years (may be distributed over a 5-year period by sampling 20% of the wells <br /> annual) : <br /> Laboratory analyses for general minerals (calcium, magnesium, sodium, bicarbonate, <br /> carbonate, sulfate, chloride, and total dissolved solids). <br /> Subsurface(Tile) Drainage System <br /> Annually: <br /> Field measurements of electrical conductivity and ammonium nitrogen'. <br /> Laboratory analyses of nitrate-nitrogen, total phosphorus, and total dissolved solids. <br /> If field measurement indicates the presence of ammonium nitrogen,the discharger shall collect a sample for <br /> laboratory analysis of ammonium nitrogen. <br /> 1. Groundwater samples from domestic wells shall be collected from the tap <br /> nearest to the pressure tank (and before the pressure tank if possible) after <br /> water has been pumped from this tap for 10 to 20 minutes. If the sample <br /> cannot be collected prior to a pressure tank, the well must be purged at least <br /> twice the volume of the pressure tank. Groundwater samples from <br /> agricultural supply wells shall be collected after the pump has run for a <br /> minimum of 30 minutes or after at least three well volumes have been purged <br /> from the well. Samples from subsurface (tile) drains shall be collected at the <br /> discharge point into a canal or drain. <br /> 2. Additional groundwater monitoring requirements are specified in Attachment <br /> A to this Order. <br /> General Monitoring Requirements <br /> 1. The Discharger shall comply with the additional groundwater monitoring <br /> requirements specified in Attachment A to this Order either through individual <br /> groundwater monitoring or by participation in a Representative Monitoring <br /> Program as laid out in Attachment. <br /> 2. The Discharger shall comply with all the "Requirements Specifically for <br /> Monitoring Programs and Monitoring Reports" as specified in the Standard <br /> Provisions and Reporting Requirements. <br />
The URL can be used to link to this page
Your browser does not support the video tag.