My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0013917
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MURPHY
>
13773
>
2600 - Land Use Program
>
PA-1800315
>
SU0013917
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/23/2021 1:18:23 PM
Creation date
3/4/2021 8:02:54 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0013917
PE
2631
FACILITY_NAME
PA-1800315
STREET_NUMBER
13773
Direction
S
STREET_NAME
MURPHY
STREET_TYPE
RD
City
ESCALON
Zip
95320-
APN
20312011
ENTERED_DATE
2/10/2021 12:00:00 AM
SITE_LOCATION
13773 S MURPHY RD
RECEIVED_DATE
4/8/2021 12:00:00 AM
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\tsok
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
254
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MONITORING AND REPORTING PROGRAM NO. R5-2013-0122 MRP-27 <br /> ATTACHMENT A <br /> EXISTING MILK COW DAIRIES <br /> 3. Proposed Monitoring Well Design - all proposed well construction information <br /> must be displayed on a construction diagram or schematic to accurately identify <br /> the following: <br /> a. Well depth. <br /> b. Borehole depth and diameter. <br /> C. Well construction materials. <br /> d. Casing material and diameter - include conductor casing, if appropriate. <br /> e. Location and length of perforation interval, size of perforations, and <br /> rationale. <br /> f. Location and thickness of filter pack, type and size of filter pack material, <br /> and rationale. <br /> g. Location and thickness of bentonite seal. <br /> h. Location, thickness, and type of annular seal. <br /> i. Surface seal depth and material. <br /> j. Type of well cap(s). <br /> k. Type of well surface completion. <br /> I. Well protection devices (such as below-grade water-tight vaults, locking <br /> steel monument, bollards, etc.). <br /> 4. Proposed Monitoring Well Development: <br /> a. Schedule for development (not less than 48 hours or more than 10 days <br /> after well completion). <br /> b. Method of development. <br /> C. Method of determining when development is complete. <br /> d. Parameters to be monitored during development. <br /> e. Method for storage and disposal of development water. <br /> 5. Proposed Surveying: <br /> a. How horizontal and vertical position of each monitoring well will be <br /> determined. <br />
The URL can be used to link to this page
Your browser does not support the video tag.