My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0013917
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MURPHY
>
13773
>
2600 - Land Use Program
>
PA-1800315
>
SU0013917
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/23/2021 1:18:23 PM
Creation date
3/4/2021 8:02:54 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0013917
PE
2631
FACILITY_NAME
PA-1800315
STREET_NUMBER
13773
Direction
S
STREET_NAME
MURPHY
STREET_TYPE
RD
City
ESCALON
Zip
95320-
APN
20312011
ENTERED_DATE
2/10/2021 12:00:00 AM
SITE_LOCATION
13773 S MURPHY RD
RECEIVED_DATE
4/8/2021 12:00:00 AM
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\tsok
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
254
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MONITORING AND REPORTING PROGRAM NO. R5-2013-0122 MRP-30 <br /> ATTACHMENT A <br /> EXISTING MILK COW DAIRIES <br /> ix. Location, thickness, and type of annular seal. <br /> X. Depth of surface seal. <br /> A. Type of well cap. <br /> Ai. Type of surface completion. <br /> xiii. Depth to water (note any rises in water level from initial <br /> measurement) and date of measurement. <br /> xiv. Well protection device (such as below-grade water-tight vaults, <br /> stovepipe, bollards, etc). <br /> h. All depth to groundwater measurements during field program. <br /> i. Field notes from drilling and installation activities (e.g., all subcontractor <br /> dailies, as appropriate). <br /> j. Construction summary table of pertinent information such as date of <br /> installation, well depth, casing diameter, screen interval, bentonite seal <br /> interval, and well elevation. <br /> 3. Monitoring Well Development: <br /> a. Date(s) and time of development. <br /> b. Name of developer. <br /> C. Method of development. <br /> d. Methods used to identify completion of development. <br /> e. Development log: volume of water purged and measurements of <br /> temperature, pH, and electrical conductivity during and after development. <br /> f. Disposition of development water. <br /> g. Field notes (such a bailing to dryness, recovery time, number of <br /> development cycles). <br /> 4. Monitoring Well Survey: <br /> a. Identify coordinate system or reference points used. <br /> b. Description of measuring points (e.g., ground surface, top of casing, etc.). <br />
The URL can be used to link to this page
Your browser does not support the video tag.