Laserfiche WebLink
<br /> <br /> <br /> made before or during the tightness test must be described in <br />the COMMENTS section. <br />Page 3 of 5 <br />Test Method Developed by Manufacturer Industry Standard Professional Engineer <br />Test Type Pressure Vacuum Hydrostatic <br />Test Equipment Used: Caldwell Level Change Indicator <br />Sump/UDC ID 1-PS-87 2-PS-91 <br />Sump Manufacturer Western FG Western FG <br />Sump Depth (inches) 45" 45" <br />Sump Bottom to Top of <br />Highest Pipe Penetration <br />(inches) <br />16" 23" <br />Test Start Time 8:42 9:32 <br />Initial Reading .001 .001 <br />Test End Time 9:12 10:02 <br />Final Reading .001 .001 <br />Change in Reading 0 0 <br />Pass/Fail Criteria > .002 > .002 <br />Tightness Test Results Pass Fail Pass Fail Pass Fail Pass Fail <br />Sump/UDC ID UDC 1&2 UDC 3&4 UDC 5&6 UDC 7&8 <br />Sump Manufacturer Environ Environ Environ Environ <br />Sump Depth (inches) 32" 32" 31" 31" <br />Sump Bottom to Top of <br />Highest Pipe Penetration <br />(inches) <br />6" 6" 6" 6" <br />Test Start Time 8:47 8:52 8:57 9:37 <br />Initial Reading .001 .001 .001 .001 <br />Test End Time 9:17 9:22 9:27 10:07 <br />Final Reading .001 .001 .001 .001 <br />Change in Reading 0 0 0 0 <br />Pass/Fail Criteria > .002 > .002 > .002 > .002 <br />Tightness Test Results Pass Fail Pass Fail Pass Fail Pass Fail <br />Additional copies of this page may be attached. <br /> <br />8. SUMP/UDC TEST