My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
3304
>
2300 - Underground Storage Tank Program
>
PR0516354
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/17/2021 1:59:53 PM
Creation date
3/11/2021 7:43:13 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0516354
PE
2361
FACILITY_ID
FA0012437
FACILITY_NAME
VALERO 82520
STREET_NUMBER
3304
Direction
W
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95219
APN
07120013
CURRENT_STATUS
01
SITE_LOCATION
3304 W HAMMER LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ELITE IV CONTRACTORS <br /> 2535 WIGWAM DR STATE LIC#1001331 <br /> STOCKTON, CA 95205 <br /> (209)461-6339 <br /> ® (209)461-6342 Fax <br /> QUOTATION <br /> Customer: HAMMER LANE CHEVRON <br /> Attention: YEASIR Quote No: 206980 <br /> Project: DISPENSER REPLACEMENT Date: 09110120 <br /> Special Terms and Conditions <br /> Acceptance: The prices,payment terms,specifications and conditions on all <br /> pages of this proposal including Standard Terms&Page are satisfactory and <br /> are hereby accepted by signature. <br /> Price Validity: 30 Days <br /> Payment Terms: $8,000.00-Balance Upon Completion <br /> Notes&Exclusions: <br /> *Remanufactured dispenser warranty work does not include labor <br /> *Does not include pulling of wires-existing to be reused. <br /> *Failure of nozzles at time of pre-test-Retest would be additional fee <br /> *Standby time waiting on parts by others <br /> *Does not include new sensors -existing to be reused <br /> *Does not include shear valves or flex connectors-existing to be reused <br /> *Additional cost if EHD requires SB989 UDC Test <br /> *Existing tank turbines&leak detectors to be reused <br /> *Does not include required vapor testing within 60 days-by others <br /> *Additional charge if delays by Applause TV downloads <br /> *Does not include primary or secondary line repairs or testing <br /> *Failure of the any of the site existing equipment will be invoiced @ T&M <br /> *Addtional charge if delayed due to equipment provided by owner <br /> *Haul off, tear down&scrap old dispensers add$100.00 per dispenser <br /> Warranty: Manufacture Warranty Applies <br /> Labor Warranty:1 year from the completion date <br /> Please Note: <br /> Master Card or Visa payment >3%additional processing fee. <br /> American Express or Discover>5%additional processing fee. <br /> Cancellations: 25%Restock fee for equipment.Paid for the work performed. <br />
The URL can be used to link to this page
Your browser does not support the video tag.