Laserfiche WebLink
�`dCrffr �i8 �� Plan Review Team PGEPIanReiew@pge,cw <br /> I_nnd Mafingomc�n4 <br /> San <br /> Rain <br /> n, Carryurr Rand 3370A <br /> Electric Co>'i petty <br /> Sen RainonCA 945B3 <br /> March 3, 2021 <br /> Stephanie Stowers <br /> San Joaquin County <br /> 1890 E. Hazelton Ave. <br /> Stockton, Ca 95205 <br /> Ref: Gas and Electric Transmission and Distribution <br /> Dear Ms. Stowers, <br /> Thank you for submitting 13821 E. Sharon Or- PA-2100013 plans for our review. PG&E will <br /> review the submitted plans in relationship to any existing Gas and Electric facilities within the <br /> project area. If the proposed project is adjacentlor within PG&E owned property andlor <br /> easements, we will be working with you to ensure compatible uses and activities near our <br /> facilities. <br /> Attached you will find information and requirements as it relates to Gas facilities (/attachment 1) <br /> and Electric facilities (Attachment 2). Please review these in detail, as it is critical to ensure <br /> your safety and to protect PG&E's facilities and its existing rights_ <br /> Below is additional information for your review: <br /> 1. This plan review process does not replace the application process for PG&E gas or <br /> electric service your project may require. For these requests, please continue to work <br /> with PG&E Service Planning: https�llwww.pae com/en USIhusii)essls_er_vjceslbuiidiilq- <br /> and-rer;avationlovet viewlcrverview.Rao. <br /> 2. If the project being submitted is part of a larger project, please include the entire scope <br /> of your project, and not just a portion of it. PG&E's facilities are to be incorporated within <br /> any CE=QA document. PG&E needs to verify that the CEQA document will identify any <br /> required future PG&E services. <br /> 3. An engineering deposit may be required to review plans for a project depending on the <br /> size, scope, and location of the project and as it relates to any rearrangement or new <br /> installation of PG&E facilities. <br /> Any proposed uses within the PG&E fee strip and/or easement, may include a California Public <br /> utility Commission (CPUC) Section 851 tiling. This requires the CPUC to render approval for a <br /> conveyance of rights for specific uses on PG&E's fee strip or easement. PG&E will advise if the <br /> necessity to incorporate a CPUC Section 851filing is required. <br /> This letter does not constitute PG&E's consent to use any portion of its easement for any <br /> purpose not previously conveyed. PG&E will provide a project specific response as required, <br /> Sincerely, <br /> Plan Review Team <br /> Land Management <br /> PGU Gas and Electric Facilities Page 1 <br />