My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SR0081560_SSNL
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
ASH
>
7707
>
2600 - Land Use Program
>
SR0081560_SSNL
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/10/2022 2:13:34 PM
Creation date
3/19/2021 9:49:49 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
FileName_PostFix
SSNL
RECORD_ID
SR0081560
PE
2602
STREET_NUMBER
7707
Direction
S
STREET_NAME
ASH
STREET_TYPE
ST
City
FRENCH CAMP
Zip
95231
APN
19310013
ENTERED_DATE
12/23/2019 12:00:00 AM
SITE_LOCATION
7707 S ASH ST
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\tsok
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
91
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Results reveal extremely low concentrations of the nitrogen fractions, as tested. The most <br />significant measurement is the carbon-to-nitrogen (C:N) ratio, which was measured at a very high <br />ratio of 165:1. Nitrification will only occur if the C:N ratio is below 20:1. Therefore, 2" of this <br />specific sawdust material is to be placed evenly over the floor of the excavated filter bed and then <br />raked 2" into the soil. Raking and incorporation of the organic material into the soil must be done <br />since nitrification readily occurs in the top two inches of soil. Thus, by incorporating the organic <br />material into the soil-effluent interface layer, nitrification is prevented and denitrification of <br />ammonium that may have nitrified in the drain rock is promoted. <br />The application rate of the shallow soils (36" depth) was determined from the perc rate to be 0.743 <br />gallons/ft2 /day. The total filter bed area is 518 ft2 of floor area. Therefore, the filter bed can <br />manage: 0.743 gallons/f 2/day x 518 ft2 = 385 gpd. The ADF was calculated to be 280 gpd. <br />There is no on-site domestic well on the property. The proposed project has received a Will-Serve <br />Letter from the City of Stockton to provide city water to the residence. <br />NLS§ 4.2. All Onsite Wastewater Treatment Systems (OWTS) will eventually fail. A reasonably <br />long lifespan of the primary disposal field can be expected based on the perc rates obtained and the <br />incorporated design factors. <br />As-Builts of the entire septic system should be submitted to the EHD by the septic system installer/ <br />contractor after installation. <br />Page -8- <br />Chesney Consulting
The URL can be used to link to this page
Your browser does not support the video tag.