My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0013963
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MURPHY
>
22640
>
2600 - Land Use Program
>
PA-2000214
>
SU0013963
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/6/2023 10:06:04 AM
Creation date
3/19/2021 1:44:08 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0013963
PE
2632
FACILITY_NAME
PA-2000214
STREET_NUMBER
22640
Direction
S
STREET_NAME
MURPHY
STREET_TYPE
RD
City
ESCALON
Zip
95336-
APN
24519045
ENTERED_DATE
3/2/2021 12:00:00 AM
SITE_LOCATION
22640 S MURPHY RD
RECEIVED_DATE
9/8/2022 12:00:00 AM
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CONDITIONS OF APPROVAL <br /> PA-2000214 <br /> Kamps Property Management, LLC/New Cingular Wireless <br /> Site Approval Application No. PA-2000214 was approved by the Community Development Department <br /> on October 18, 2022. The effective date of approval is October 28, 2022. This approval will expire on <br /> April 28, 2024, which is 18 months from the effective date of approval, unless (1) all Conditions of <br /> Approval have been complied with, (2)all necessary building permits have been issued and remain in <br /> force,and (3) all necessary permits from other agencies have been issued and remain in force. <br /> Unless otherwise specified, all Conditions of Approval and ordinance requirements shall be fulfilled <br /> prior to the establishment of the use and the issuance of any building permits. Those Conditions <br /> followed by a Section Number have been identified as ordinance requirements pertinent to this <br /> application. Ordinance requirements cannot be modified, and other ordinance requirements may <br /> apply. <br /> 1. COMMUNITY DEVELOPMENT DEPARTMENT(Contact: [209]468-3121) <br /> a. BUILDING PERMIT: Submit an"APPLICATION-COMMERCIAL BUILDING PERMIT".The Site Plan <br /> required as a part of the building permit must be prepared by a registered civil engineer or licensed <br /> architect. This Plan must show drainage, driveway access details including gates, on-site parking, <br /> landscaping, signs, existing and proposed utility services, and grading (refer to the "SITE PLAN <br /> CHECK LIST" for details). Foundation and soils investigation shall be conducted in conformance with <br /> Chapter 18 of the California Building Code at the time of permit application. A fee is required for the <br /> Site Plan review. (Development Title Section 9-884) <br /> b. APPROVED USE: This approval is for a 125-foot-tal wireless telecommunication monopole tower <br /> to be located within a 1,600-square-foot lease area with associate equipment and backup generator <br /> as shown on the revised site plan dated September 7, 2022. (Use Type: Communication Services <br /> —Type II) <br /> c. CAPITAL FACILITY FEE:This project may be subject to the Capital Facility Fee. If the Capital Facility <br /> Fee is applicable, the County shall collect the fees before the issuance of any building permits. <br /> (Development Title Section 9-1245.2) <br /> d. SETBACKS: The structure shall comply with the following setback requirements: <br /> 1. The proposed tower shall be located a distance equal to at least the height of the said structure <br /> from residential structures on adjoining properties. (Development Title Section 9-1065.4[d]) <br /> e. MAINTENANCE OF FACILITIES: All freestanding structures, antennas, and supporting equipment <br /> associated with wireless telecommunication shall be maintained in good condition by the provider of <br /> the telecommunication facility and, whenever necessary, repaired or replaced. (Development Title <br /> Section 9-1065.7) <br /> f. REMOVAL OF FACILITIES: Freestanding structures, antennas, and supporting equipment <br /> associated with wireless telecommunication shall be removed by the provider of such facilities and the <br /> site restored to its pre-construction state if said facilities have not been operational or used for a period <br /> of 6 consecutive months. Removal and site restoration shall be completed within 90 days of the end <br /> of said 6-month period. (Development Title Section 9-1065.8) <br /> 2. DEPARTMENT OF PUBLIC WORKS (Contact: [209]468-3000, see memo dated September 9, 2022) <br /> 3. ENVIRONMENTAL HEALTH DEPARTMENT(Contact: [209]468-3436, see memo dated September 15, <br /> 2022) <br /> PA-2000214 (SA) —Conditions of Approval 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.