My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0013963
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MURPHY
>
22640
>
2600 - Land Use Program
>
PA-2000214
>
SU0013963
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/6/2023 10:06:04 AM
Creation date
3/19/2021 1:44:08 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0013963
PE
2632
FACILITY_NAME
PA-2000214
STREET_NUMBER
22640
Direction
S
STREET_NAME
MURPHY
STREET_TYPE
RD
City
ESCALON
Zip
95336-
APN
24519045
ENTERED_DATE
3/2/2021 12:00:00 AM
SITE_LOCATION
22640 S MURPHY RD
RECEIVED_DATE
9/8/2022 12:00:00 AM
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FINDINGS FOR SITE APPROVAL <br /> PA-2000214 <br /> Kamps Property Management, LLC/New Cingular Wireless <br /> 1. The proposed use is consistent with the goals, policies, standards, and maps of the General Plan, any <br /> applicable Master Plan, Specific Plan, and Special Purpose Plan, and any other applicable plan adopted <br /> by the County. <br /> • This finding can be made because the proposed use of the telecommunications tower is <br /> located in the AG-40 (General Agriculture—40-acre minimum)zone, and the Communications <br /> Services—Type II use type may be conditionally permitted in this zone with an approved Site <br /> Approval application. The project site has a General Plan designation of A/G (General <br /> Agriculture),and the AG-40 zone is an implementing zone for this designation.The proposed <br /> tower is consistent with the goals, policies, standards, and maps of the General Plan, and <br /> there are no Master Plans or Special Purpose Plans applicable to this site. <br /> 2. Adequate utilities, roadway improvements, sanitation, water supply, drainage, and other necessary <br /> facilities have been provided, and the proposed improvements are properly related to existing and <br /> proposed roadways. <br /> • This finding can be made because there are no new utility improvements required. The <br /> proposed project includes a new tower and is an unmanned facility and will not impact <br /> existing public utilities. This project will not require the use of public water,sewer, or storm <br /> drainage, nor are private services required for this use. The project site will continue to be <br /> accessed from S. Murphy Road. <br /> 3. The site is physically suitable for the type of development and for the intensity of development. <br /> • This finding can be made because the 28.74-acre parcel is of adequate size and shape to <br /> accommodate the proposed use, building coverage, setbacks, and other requirements of <br /> the Development Title. The parcel can accommodate the use of the telecommunications <br /> facility and the associated ground equipment within the existing lease area. <br /> 4. Issuance of the permit will not be significantly detrimental to the public health, safety, or welfare or be <br /> injurious to the property or improvements of adjacent properties. <br /> • This finding can be made because it was determined that the project will not be detrimental <br /> to the Public Health. A Notice of Exemption from CEQA (California Environmental Quality <br /> Act)will be filed.The telecommunications tower must comply with Federal Communications <br /> Commission regulations regarding radio frequency emissions. <br /> PA-2000214 (SA) — Findings 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.