My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0013955
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
ARMSTRONG
>
3725
>
2600 - Land Use Program
>
PA-2100022
>
SU0013955
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/14/2022 1:46:33 PM
Creation date
3/19/2021 2:03:21 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0013955
PE
2626
FACILITY_NAME
PA-2100022
STREET_NUMBER
3725
Direction
E
STREET_NAME
ARMSTRONG
STREET_TYPE
RD
City
LODI
Zip
95240-
APN
05811046, -45, -44
ENTERED_DATE
2/23/2021 12:00:00 AM
SITE_LOCATION
3725 E ARMSTRONG RD
RECEIVED_DATE
11/10/2021 12:00:00 AM
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\tsok
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ATTACHMENT A <br /> PROJECT DESCRIPTION: 40FORTY WINERY AND BREWERY <br /> The 40FORTY Winery and Brewery project ("Project") consists of developing a <br /> winery and brewery facility over two phases on 40±acre project site located at <br /> 3725 E. Armstrong Road. The Project consists of approximately 30 acres of <br /> existing and proposed vineyards, as well as the planting of approximately 1 acre <br /> of hops. There currently exist the following improvements/structures on the <br /> property: two single family residences, a barn, shop, a chicken coop, and various <br /> outbuildings. These facilities are served by an existing well and two septic <br /> systems. As shown on Figure 1, all such structures, except the western single <br /> family residence, will be demolished and removed from the property. <br /> The Project will be built in two phases over five years. Phase 1 will include a <br /> 4,000±SF production wine and brewery facility with barrel and tank storage, case <br /> good storage, covered crush pad, office, and wine lab. The first phase will also <br /> include a 3,000+ SF tasting room with outdoor seating. As noted in Figure 1, <br /> several existing structures and outbuildings on the property will be demolished in <br /> Phase 1. Phase 2 will add a 4,000+ SF multipurpose building, additional outdoor <br /> seating, and future 4,000 SF production. Domestic water will be supplied by the <br /> existing onsite well and treated to required specifications. Wastewater will be <br /> handled in two ways:Traditional wastewater (sewage) will be handled through <br /> the onsite septic system. Wastewater generated from the onsite wine and beer <br /> production is proposed to be held in above-ground holding tanks and hauled off <br /> site on an annual basis. Proposed driveway and parking surface is to be <br /> gravel. Any storm water runoff will be drained into the vineyards and contained <br /> onsite. The Project will result in approximately 30 acres of wine grapes and 1 acre <br /> of hops as shown on the site plan. Amplified outdoor music is not proposed as <br /> part of the winery Project. <br /> The Project site is zoned AG-40. The Project would include the following use-types <br /> as set forth in the Development Title: "Small Winery' use type -- permitted <br /> subject to a site approval in AG the zone (see, TABLE 9-605.2 -. USES IN <br /> AGRICULTURAL ZONES). The accessory brewery is permitted subject to a use <br /> {00177166.2} <br />
The URL can be used to link to this page
Your browser does not support the video tag.