Laserfiche WebLink
1 <br />LEGEND <br />W POTABLE GROUNDWATER WELL <br />W IRRIGATION WELL <br /> EXISTING SEPTIC SYSTEM <br /> PERCOLATION TEST (NOA 2014) <br /> PROPOSED BUILDING EXPANSION <br /> BUILDINGS W/ SEPTIC SYSTEM <br />1. SIERRA VIEW MAUSOLEUM <br />2. ADMINISTRATION OFFICE <br />3. SALES & ADMINISTRATION OFFICE <br />4. GROUNDS CREW LUNCH ROOM <br />5. CASCADE GARDENS RESTROOMS <br />6. EVERGREEN CHAPEL RESTROOMS <br />7. VINEYARD CHAPEL <br />8. CASCADE BUILDING <br />9. SHOP <br />10. UNIDENTIFIED <br />2 <br />3 4 <br />5 <br />6 <br />7 <br />GROUNDWATER SAMPLE <br />LOCATION <br />NITRATE AS N 1.4 mg/L <br />DBCP 0.12 μg/L <br />HARNEY LANE <br />W <br />W <br />W <br />(5166 E. HARNEY LANE)STATE ROUTE HIGHWAY 99 <br />(13840 N. BECKMAN ROAD) <br />(13642) <br />(13638) <br />13634) <br />(14000 N. BECKMAN ROAD) <br />(14150 N. BECKMAN ROAD) <br />(4825) <br />(14370 N. BECKMAN ROAD)(14273 N. BECKMAN ROAD) <br />P1 - 15.63 MIN/INCH, <br />3.05 FT BGS <br />P2 - 20.83 MIN/INCH, <br />3.07 FT BGS <br />SITE DIAGRAM <br />Cherokee Memorial Park, Vineyard Chapel Addition <br />13951 North Beckman Road <br />Lodi, San Joaquin County, California <br />902 Industrial Way <br />Lodi, CA 95240-3106 <br />DIAGRAM IS FOR GENERAL LOCATION ONLY, AND IS <br />NOT INTENDED FOR CONSTRUCTION PURPOSES <br />NA207102 <br />AERIAL PHOTOGRAPHY PROVIDED <br />BY MICROSOFT BING MAPS. LEGEND <br />LOCATIONS ARE APPROXIMATE. <br />TKW <br />AJM <br />AJM <br />AS SHOWN <br />N/A <br />FEB 2021 <br />Scale: <br />2 <br />(PROPOSED LEACH FIELD & <br />100% REPLACEMENT AREA) <br />ExhibitProject Manager: <br />Drawn by: <br />Checked by: <br />Approved by: <br />Project No. <br />File Name: <br />Date: <br />TKW <br />APPROXIMATE <br />SITE BOUNDARY <br />8 <br />9 <br />10