Laserfiche WebLink
EQUIPMENT SCHEDULE SYMBOL LEGEND 208V, 240V SYSTEM 208v 10 <br /> DISCONNECT (42' FOR 480V W/GROUND <br /> MARK MAKE MODEL DESC. CAPACITIES AMB ELECTRICAL ACCESS❑RIES SYMBOL ITEM ABBREV. SYSTEM) POSITIVE FLOW WIRE <br /> WEATHERT❑P OR FLUE CAP <br /> CFM HEAT COOLING 102 ITEM QTY VOLT PH RECTANGULAR DUCT SIZE CL 120v 10 <br /> NET INSIDE DIMENSIONS C❑UNTERFLASHING W/GROUND APEX <br /> IN/❑UT TOT/BENS —_ —_ LINED DUCT WITH INSULATION 1' CLEAR SPACE FUSED DISC BY WIRE <br /> SEE DRAWING FOR THICKNESS ELECTRICAL <br /> RTU-1 CARRIER PACKAGE 2000 72 57,5 85 FLA 25.0 208V 3PH W/ ECONOMIZER ELECTRICAL PANEL OR UNIT BETWEEN JACK AN CONTRACTOR <br /> FLEXIBLE SUPPLY DUCT, CLASS 1 DISCONNECT FLUE/DUCT ARCHITECTURE <br /> 5 TON 48HCDA06 GAS 0.5" 56 47,2 65 MCA 28.5, MOCP 45 HIGH STATIC MOTOR — — — — — FLEXIBLE RETURN DUCT, CLASS 1 FINISH R❑❑FING - R❑LL LINE fo EC❑N LOGIC <br /> ELECTRIC AFUE 82% 12.45 EER ROOF CURB WT=720 VD - VOLUME DAMPER, REQUIRED NONE DEDICATED CLEAR <br /> UP JACK AND ATTACH RTU- B <br /> O RD <br /> 15.2 SEER FD - FIRE DAMPER FDR UNOBSTRUCTED WORKING SPACE UNDER C❑UNTERFLASHING 12' <br /> FSD - FIRE SMOKE DAMPER FSD IN FRONT OF PANEL, <br /> RTU-2CARRIER PACKAGE 1600 72 48.5 85 FLA 20.7 208V 3PH W ECONOMIZER VD FLOOR/ROOF TO STRUCTURAL ROOF JACK - 24 GA RC RH G Y1 Y2 W1 W2 C 24 845 S. Commerce Street <br /> / CSFD - CEIL. FIRE SMOKE DAMPER CSFD MEMBER ABOVE PER NEC110-16 & NAIL TO ROOF W/ MIN C Stockton, CA. 95206 <br /> 4 TON 48HCDA05 GAS 0.5" 56 39,7 65 MCA 23.8, MOCP 30 HIGH STATIC MOTOR MD DM - MOTORIZED DAMPER MD DM 384-4, VERIFY ALL POSSIBLE 4-2'104 NAILS <br /> ELECTRIC AFUE 82% 13 EER ROOF CURB WT-710 CONFLICTS WITH OTHER TRADES (209) 662-4874 <br /> 15.6 SEER # DUCTWORK - GI SPIRAL PIPE <br /> PRIOR TO ROUGHING IN THE <br /> MAU-1 CAPTIVEAIRE MAKEUP 2138 - - - 1 HP 208V 30 SEE SEE CAPTIVEAIREE?J TURNING VANES TV <br /> PANEL BOARD OR DISCONNECT, DSD. SD apexplanning@hotmail.com <br /> SEE STRUCT DWGS AIR PRODUCTS SL 2000 <br /> A2-20D AIR UNIT 0.5" CAPTIVEAIRE DRAWINGS, WT=650# 300 FIRST LETTER <br /> FOR TRUSSES <br /> CEILING O CTRIC SMOKE <br /> WALL DETECTOR <br /> • Steven Anthony Torres II <br /> DRAWINGS CS-4 LOCATION: T DETECT❑R <br /> 12x12 FLOOR ELECTRICAL PANEL/DISCONNECT g 2x BLOCKING BY <br /> CS-4 SECOND LETTER RC RH G Y1 Y2 W1 W2 C <br /> DIFFUSER/REGISTER SCHEDULE SERVICE: SUPPLY DETAIL Architect # C32553 <br /> [RETURN O FLUE ❑R ROUND _ HONEYWELL VISI❑NPR❑ 8000 WITH <br /> AUTOMATED DEMAND RESPONSE TEST REMOTE <br /> MARK MAKE DESCRIPTIO FACE BLOW DAMPER COLOR REMARKS EXHAUST EXH, DUCT TEST SWITCH <br /> 01NUMBER-TYPE: FUNCTI❑N SERIES Y AND W GRN LJD0SEE SCHED. HIGH TEMP (500°) FLEX TERMINALS T❑ MATCH UNITS AND LED'sMODEL N MOUNT OPERATING WT LED 0 <br /> CR-1 300 - CFM, CUBIC FEET PER MINUTE C❑NNECT❑R WITH R❑PE GASKET �� H❑RNR STR❑ED <br /> CS-4 TITUS CEILING BLADE 4-WAY WYE WHITE INSTALL VD IN WYE 12x12 - GRILLE NECK SIZE IN INCHES CLAMP FLEX C❑NNECT❑R 4-12 0 DUCT THRU R❑❑ 5 RES <br /> TDC-3-A4 SUPPLY T-BAR BRANCH BRANCH/BRANCH DUCT 0PROVIDE VD'S AT ALL WYES AND TAPS TO DUCT W/ SS 1/2" AIR PRODUCTS <br /> DETAIL <br /> SUPPLYING GRILLES AND REGISTERS FOR WIDE H❑SE CLAMPS M O MS-RH/KA/P/AT <br /> CS-4A TITUS CEILING BLADE 4-WAY WYE WHITE INSTALL VD IN WYE CE-1 AIR BALANCING PER T-24. FAN AND BASE <br /> TDC-6-A4 SUPPLY SURFACE BRANCH BRANCH/BRANCH DUCT GASKET - HIGH <br /> O THERMOSTAT, UNIT N0. — TEMP RTV THERM ❑ STA T <br /> + CR-1 TITUS 350R CEILING BLADE NA WYE WHITE INSTALL VD IN WYESEALANT <br /> RETURN T-BAR BRANCH <br /> BYPASS, NITESTAT, CLOCK 8 GA ALL WELDED WYE/ELB❑W/SAMCNA DUCT SUPPORT <br /> 1 <br /> WEATHERT❑P W/18'0L❑W LOSS 'A' OR 'B' M O <br /> )E CR-2 TITUS 350R CEILING BLADE NA WYE WHITE INSTALL VD COLLAR WELDED T❑ DUCT,IN WYE ABBREVIATIONS W/OR WO SYMBOLS FITTINGNG BELOW DETAIL <br /> ATTACH 18 GA VENTILATED <br /> RETURN SURFACE BRANCH BRANCH/BRANCH DUCT WITH W/ ROOF CURB TO FAN BASE <br /> W/3#10x1" SM SCREWS 2 <br /> CONTRACTOR SHALL CONFIRM ALL REFLECTED CEILING GRID SYSTEMS WITH THE BORDER SPECIFIEDEA SIDE OF FAN BASE <br /> IN THE SCHEDULE FOR LAYIN DIFFUSERS AND SHALL SUBMIT DIFFUSER BORDERS MATCHING GRID — WITH OUT WO/ 18 GA VENTILATED ROOF CURB <br /> SYSTEMS, DOWN DN ATTACH VENTILATED vD— L 5' MA FLEX 2'x24 GA GI DUCT SUPPORT STRAP <br /> RUN ALL FRONT FACE REGISTER BLADES PARALLEL TO FLOOR WHEN MOUNTED IN WALLS CURB TO 18 GA ROOF CURB WITHIN 2' OF REGISTER - MIN FLEX <br /> SAS SAS - SEE ARCHITECTURAL SCHEDULE FOR FLOOR, CEILING AND WALL FINISHES, CONFIRM REGISTER GALVANIZED SHEET METAL GI 2 EAISIDE of CURB WBASE DUCTS S DUCT LSHALL DISPLAY ENGTH IS 3'2' STHEHDUCTAT LL <br /> FINISH (MILL OR PAINT) WITH ARCHITECT PRI❑R TO ORDERING SLOTS, 26 GA GI CS- 4A.CS-1. DS-1 VD FURNISH AT ALL SUPPLY IZE AND INSULATION VALUE AND <br /> + N❑ SCREW HOLES — ABOVE FINISHED FLOOR AFF C❑UNTERFLASHING - TITUS OR REGISTERS IN WYE OR TAP, MAX LENGTH IS 10' FOR ❑SHPD, 5'0' <br /> FILL V❑ID SPACE W/ EQUAL, WHITE DAMPER SHALL HAVE FOR ALL OTHERS, ALL ELBOW EL DORADO GAS <br /> — BELOW FINISHED FLOOR BFF RIGID INSULATI❑N FINISH, NO OBD, L❑CKING QUADRANT ON 1' RADIUS'S TO BE 1,5 DUCT DIAMETER, STATION <br /> EXHAUSTE A N SCHEDULE FINISH ROOFING— - R❑LL SIZE AS INDICATED STANDOFF, 3/8'0 DIAMETER FLEX DUCT TURNS TO BE 2.0 DUCT <br /> — BELOW FINISHED CEILING BFC UP CURB AND ATTACH TO ON FLOOR PLANS SHAFTS, DIAMETER IMPROVEMENT <br /> NAILER <br /> MARK MAKE MODEL DESC, CAPACITIES ELECTRICAL ACCESS❑RIES AND OPERATING WT# 3/8'Ox3-1/2' LAG BO - EMBED PLYW❑❑D/SKIP AT CEILING SYSTEM <br /> ABOVE FINSHED CEILING AFC <br /> ITEM QTY VOLT PH CONTROLS 3' MIN, PLACE 48'❑C SHEETING ROOF 1605 S. EL DORADO STREET <br /> CFM "ESP RPM S❑NNES — NEW DUCTWORK — SEE STRUCT DWGS ATTACH TO JOISTS Stockton, CA. 95206 <br /> FOR TRUSSES WITH 1-#10x1-1/2' AIR OUTLET - WT<10# <br /> CEF-1 BROAN L100 CEILING 100 0.5 850 5.4 100 WATT 120 10 BDD, BS, SPEED 8# FRAMING 2x2 FASTAP SCREW, NOT <br /> DEMOLITION TO BE REMOVED TBR 4x BLOCKING BY GC SECURE CEILING OUTLET TO S,A,T, <br /> EXHAUST FAN CONTROLLER AND -ATTACH T❑ JOIST CEILING GRID WITH (2) #10x1/2' S/M <br /> DISCONNECT DUCTWORK EXISTING (E) 1-HR SHEET ROCK (SR)SHA T W/2-1/4'Ox2' LAGS _­_T SCREWS THRU OUTLET FLANGE T❑ <br /> 18 GA WELDED DUCT EMBED 1-1/2' MIN AL <br /> G❑ <br /> DIAN <br /> KHF-1 CAPTIVEAIRE KITCHEN 2250 0.9 1030 11,7 1 HP 208V 30 SEE CAPTIVEAIRE 160# SEE GREASE TIGHT, 3' GRID RUNNER AND CORNERS INSTALL AT AT IA N SLACK <br /> DU180HFA HOOD FAN DRAWINGS CAPTIVEAIRE POINT OF CONNECTION POC AIRGAP T❑ INSIDE SR DOUBLE NUTTED ALL DUCT STRAP_ WIRES ATTACHED TO STRUCTURE <br /> DRAWINGS PER CMC <br /> CUT OFF POINT COP LINE OPENING WITH THREAD ROD WITH ABOVE USING CLOSED LOOP EYEB❑LTB, <br /> 5/8" TYPE 'X' SHEET SQ 1-b"xl-�'xh" WIRE AND SCREWS ARE REQUIRED ON <br /> BDD - BACK DRAFT DAMPER, LOW LEAK ROCK WHERE HOOD WASHER TO SUPPORT % \ ALL REGISTERS, <br /> EXHAUST IR DUCT STRAP <br /> BS - BIRD SCREEN FURNISHED BY OTHERS FBO � <br /> GOES THRU KITCHEN 3M FIRE BARRIER 11 R' <br /> UP THROUGH ROOF UTR ROOF 1-h'x24 GA <br /> REFRIGERATION MED TEMP EQUIPMENT SCHEDULE <br /> 615C DUCT WRAP <br /> UNLESS OTHERWISE NOTED JON BELLY BAND <br /> AR❑UND PIPE <br /> MARK MAKE DESC. CAPACITIES AMB ELECTRICAL ACCESS❑RIES C CONDENSATE, OVERFLOW C, OF KHF- THRU ROOF 1 0 'A' DUCT SUPPORT <br /> MODEL CFM MBH HEAT MBH COOLING 102 ITEM QTY VOLT PH M O T-BAR REGISTER 2 <br /> — HWS HEATING WATER SUPPLY, RETURN HWS,HWR DETAIL PLYWOOD/SKIP <br /> IN/OUT T❑T/SENS SHEETING R❑❑F 2x2xJ' ANGLE DETAIL M 0 <br /> RFC-1A, LARKIN REFRIGERATION 2800 - 26.7 MBH - FLA 1,5 208V 1PH WT=50# POWERED FROM CHWS CHILLED WATER SUPPLY, RETURN CHWS,CHWR - ATTACH TO <br /> 1B LCA6215 4 FAN COIL DEF=AIR MCA 15 RCU-1 J❑IST/TRUSS <br /> FAN UNIT — MACHINE BOLT MB B-LINE B359 TWO HOLE w/ J'xl-1/2' <br /> 90°CONNECT❑R - ATTACH TO LAG BOLT - PLAN REVIEW ACCEPTANCE <br /> RCU-1 LARKIN REFRIGERATION I NA - 53.5 MBH - 6HP FLA 23,7 208V SIZED FOR 110 AMB, G,LPG NATURAL GAS, LPG LINE G, LPG " EMBED 1' MIN <br /> M❑Z060M63C CONDENSING UNIT 3PH MCA 42 MOCP 60 R-407A, 25 SST WT=317# MAU-1 - KITCHEN SIDE ❑F EVAP COOLER W/2 <br /> MACHINE BOLTS WITH WASHERS, 1 DOUBLE NUTTED ALL <br /> ALL THREAD ROD ATR EVAPORATIVE COOLER 3/8'x2" LAG BOLT FLEX DUCT TO MAIN RUN TO BE Aug4 2020 <br /> HVAC Notes sheet metal, insulation, liners, plastics, rubber �PROVIDE i"Ox2" LONG D❑BLE EMBED PINT❑ THREAD ROD WITH SQ MIN 3'2' LENGTH S❑ THAT THE g <br /> 1. Furnish and install all ductwork in accordance cements, latex, etc. shall be made of materials with a — OUTSIDE AIR OSA NUTTED CLOSED EYE FOR CHAIN JOIST/TRUSS 1-h'x1-J'xh' WASHER DUCT SIZE AND INSULATION <br /> 1- 'xl- 'x18 GA <br /> TO SUPPORT STRAP VALUE IS SHOWN ❑N ALL DUCTS <br /> with the latest editions of CMC (SMACNA duct Flame spread <=25 and smoke <=50. TO ATTACH TO CONNECTOR SEISMIC BRACE AND MAX LENGTH TO BE 10'0' FOR WEST COAST CODE CONSULTANTS <br /> construction standards). 13. It is the responsibility of the Mechanical Contractor FEET PER MINUTE FPM -LOCATE EVERY 40' 1- 'x24 GA BELLY ❑SHPD AND 5'0' FOR ALL OTHERS, <br /> 2. All pipes, ductwork and conduit shall be installed and to coordinate the installation of his work including DUCT TEMPERATURE SENSOR DTS PROVIDE H❑LDDOWN AT EACH AND AT CHANGES IN BAND AROUND PIPE 12" GI DUCT EXTENSI❑N <br /> seismically braced per SMACNA's Seismic Restraint equipment substitutions with the other trades CORNER, STAND WILL PREVENT DIRECTION OF PIPE - DUCT IS EXPOSED ABOVE CEILING <br /> Guidelines, OSHPD re-a roval #R0010, includingbut no limited to electrical, fire sprinkler, FLEXIBLE DUCT CONNECTOR FC UNIT FROM MOVING LATERALLY INSULATION, FLEX <br /> p pp pLATERAL BRACE 80' DUCT TO MAIN RUN <br /> 3, All contractor furnished equipment installation and framing and plumbing, — FLEX DUCT - AND CHAIN WILL PREVENT UNIT ❑c AND AT CHANGE <br /> startup instructions shall be kept with the piece of 14, Insulate all ductwork per the T-24 energy FROM TIPPING. UNIT WEIGHT LATERAL BRACE ❑F DIRECTI❑N24 GAUGE GI REGISTER <br /> equipment in weatherproof pouches until final requirements found in the T-24 compliance report, — STEAM PIPE S WITH STAND 650# 40' ❑c AND AT CAN <br /> inspection. After final inspection, three sets of All ducwore tested or leaks wa maximum p <br /> tk shall bttd flkith iCHANGE ❑F SCREW CAN T❑ <br /> p DIRECTION BLOCKING - 4 TOTAL <br /> STEAM CONDENSATE SC <br /> operation, installation, maintenance and start-up static pressure in the duct of 1,0', maximum leakage — 4- <br /> TURNBUCKLE shall be given to the Owner for each shall not exceed 4% of the total supply and return — TURNBUCKLE - TIGHTEN CHAIN <br /> MAKEUP WATER CW TILL SNUG AGAINST SIDE OF <br /> piece of equipment per the Ca Green Building Code, All air volumes, EVAP COOLER 'B' SEISMIC ANCHORAGE DETAIL <br /> equipment shall be installed, isolated and supported 15, All economizer, thermostat and fan systems shall be DQ SHUT OFF/BALL VALVE BV X. <br /> per the manufacturer's written instructions, tested per T-24 for compliance with the T-24 report _ 1- A-0 SOLID CHAIN CUT T❑DUCT SMOKE DETECTOR DSD DUCT D U P P❑RTS 6 <br /> 4, All Fire and Fire Smoke Damper installation and the appropriate forms indicated in the T-24 LENGTH AND WELD ATTACHMENT <br /> instructions shall be made available to the inspecting report shall be provided and signed by the LINKS CLOSED DETAIL M 0 - <br /> authority for their review. Contractor prior to project close out and the HERS REGISTER SEE PLAN <br /> 5. Allenetrations through fire rated assemblies shall reports loaded u to the appropriate CHEERS or WELD i"Ox1" CLOSED EYE TO FOR SIZES - PROVIDE <br /> p g p p ppro p 1/2' SOUND LINER IN <br /> be fire stopped and sealed with a material that CAL-Certs hosting service, ANGLE IRON STAND REGISTER CAN <br /> meets or exceeds the `T' rating of the assembly 16, Contractor shall label all equipment with unique SEE RA5,6,7 AND 8 FOR ANGLE (2)#12 SM SCREWS <br /> penetrated, Materials to be used for sealing shall identification using plastic engraved plates with 1/2" AIR BALANCE fAT EACH CORNER <br /> P 9 9 P 9 P � � IRON STAND CONSTRUCTION AND <br /> be coordinated with the General Contractor to tall lettering indicating the equipment number and TABLE41 <br /> ATTACHMENT CEILING REG DETAIL 3 <br /> provide one brand onsite, state the areas served by the equipment, See 2x2x18 GA <br /> 6. Install all pipe and duct insulation materials per T-24 specifications on dwgs, TAG AIRFLOW DETAIL M 0 <br /> requirements. All material to be installed shall meet 17. All flex duct will be stretched as tight as possible <br /> CBC flame and smoke requirements per note 11. and as per manufacturers listing to avoid all kinks RTU-1 225 3/16'x2' ANGLE LAG <br /> shall conform to the and sagging, INT❑ PLYWOOD - <br /> 7. All work on this <br /> project 99 9� RTU-2 150 MAU-1 SEISMIC H❑L D D❑W N 1 1 EMBED 1' MINIMUM 4 GA GI WEATHER HOOD <br /> following codes: 18, All smoke detectors shall be tested as required With 22 GA MIN REFRIGERANT PIPING <br /> an approved smoke system per the City of MAU-1 2138 DETAIL M O DUCT SUPPORT - PLATFORM CURB W/2x4 AND ELECTRICAL CONDUIT <br /> 2016 CBC Stockton's standards in the presence of the TOTAL OUTSIDE AIR 2513 DETAIL M 14• NAILMIN ER UP THRU SAFE, EACH <br /> 2016 CPC inspector or fire Marshall, TRADE RESPONSIBLE FOR PLACING <br /> 2016 CMC 19. All on systems shall require an air balance report u KHF-1 2250 INVERTED P-TRAP RIGID INSULATI❑N ROOFER RESPONSIBLE FOR <br /> Y q P P MAU- BY MECHANICAL PITCH AND INSULATION W/INSECT SCREEN ❑ MECHANICAL SCHEDULES <br /> 2016 CEC final inspection, Submit reports on NEBS or NABC <br /> p p CEF-1 100 12 GA < CLIP - ATTACH INLET CONTRACTOR 24 GA GI CAP - <br /> 2016 CALIFORNIA GREEN BUILDING C❑DE, forms an independent certified air balance showing T❑ EC - 2#8 SM SCREWS DRAIN - SEE PLUMBING C❑UNTERFLASHING W/ DETAILS, AND NOTES <br /> system has been balanced and OSA quantities Set t0 FOR CONTINUATION CANT STRIP ATTACH T❑ CURB W/ <br /> Y q CEF-1 100 EACH POST ABOVE WATER LINE SS DRAWBAND, SEAL AROUND BY ROOFER #10x1-1/2" SM SCREWS <br /> 8. All Wye branches connected to a diffuser, grille or that shown on drawings, IN PAN, 2-1/4' LAGS TO FLASHING AND PIPE W/SIKAFLEX 12" ❑C S CONAL <br /> FN <br /> register shall have a manual TOTAL EXHAUST AIR 2450 PLYWOOD EMBED 1' - SEAL 1' CLEAR SPACE 24 GA GI COUNTER 5volume damper installed 20, Condensate drain lines installed in direct or indirect PENETRATIONS WATER TIGHT FLASHING G• o �� <br /> In the Wye branch, ❑BD's shall only be used when sunlight shall be UV resistant CPUC or PVC pipe and BETWEEN JACK AND FILL WITH 3' PITCH <br /> J' tr <br /> Wye branches will 4x BL❑CKING FOR DRAIN FLUE/DUCT 1/4"Ox2-1/2' MINIMUM be installed over inaccessible ceiling shall be painted to protect from UV radiation, OR 6' GA CHANNEL LAG BOLT ¢ <br /> areas or in the slab of the building. Dampers shall 21. Seal all joints and seams with DP-1010 duct sealer, SET BLOCKING IN MASTIC FINISH ROOFING - ROLL EMBED 2' MIN RIGID INSULATI❑N <br /> P J UP JACK AND ATTACH ` N0: M29769- <br /> be fabricated of the same gauge as the duct with 1" 1-1/8' PLYWOOD TOP W/ UNDER C❑UNTERFLASHING 1 " PLACE 48'❑C REN. 6-30-20 Q <br /> standoff, locking quadrant, and handle. Fasten red T-24 MECH AND PLUMBING MANDATORY FEATURES 24 T❑PGTOGI COVER <br /> W/1- ATTACH <br /> T A H ROOF JACK - 24 GA 1 ' 9F��eNAN\GPo�� <br /> ribbon to handle to mark location, 24' ❑C ALL SIDES NAIL TO ROOF W/ MIN OF C P��� <br /> 9. All gas pipe to be schedule 40 with screwed fittings, L EQUIPMENT SHALL BE CERTIFIED TO MINIMUM EFFICIENCY 4-2'1od NAILS <br /> All air conditionin /refri eration condensate drain PER SECTION 110,2 - SEE SCHEDULES ❑N M-0. 14 GA GI ROOF CURB <br /> 9 9 12' MIN HT PR❑VIDE INTERNAL SEE STRUCT DWGS _ BL❑ KING AT <br /> Lines shall be schedule 40 PVC run to the an 2. HVAC CONTROLS AND EQUIPMENT CERTIFIED PER SECTION SUPPORT EVERY 54' FOR TRUSSES ROOF AS RE'QD APEX 08-32 <br /> approved receptor, Set pipe on redwood blocks with 120.2 FOR THERMOSTATS AND DDC CONTROLS - SEE 26 GA GI 2x BLOCKING BY G - DRILL ROOF 1/8' LARGER <br /> C❑UNTERFLASHING PROJECT: <br /> 24 ga GI cover unless otherwise shown differently on DETAILS ON M0. THAN PIPE SIZE <br /> drawings, 3. SERVICE WATER HEATING SHALL COMPLY WITH SECTI❑N THESE PLANS ARE SUBJECT FILL VOID SPACE W/ OR <br /> g RIDGID INSULATI❑N EXHE DUCT ROUND _ DATE 1/29/2020 <br /> 10. Provide smoke detectors in the supply air duct on all 110.3 , FINISH ROOFING - ROLL <br /> units when the aggregate cfm exceeds 2000 cfm of 4. USE OF PILOT LIGHTS ON HVAC, GAS COOKING POOL AND TO FIELD APPROVAL UP CURB AND ATTACH T �� <br /> NAILER <br /> all equipment serving a room or more than one room SPA HEATERS PROHIBITED PER SECTION 110,5 3/8'Ox3-1/2' LAG BOLT - EMBED 4-12`0 PVC COMB AIR/FLUE THRU ROOF 8 <br /> and the room has no direct exits to the exterior, 5, LAVAT❑RIES SHALL BE SET TO MAINTAIN DISCHARGE TEMP 3' MIN, PLACE 48'❑c rrn DETAIL M PIPE PENETRATION THRU ROOF 4 <br /> REV.# DATE ISSUED DESCRIPTION <br /> Duct smoke detectors shall be installed after the AT 1102F OR LESS PER SECTI❑N 110,3 - SEE PLUMBING IF THESE PLANS ARE NOT ON THE JOB SEE STRUCT DWGS <br /> supply fan before any branch takeoffs, When more SCHEDULE FOR TRUSSES DETAIL MO <br /> than one unit serves a TI space and the aggregate 6. VENTILATION REQUIREMENTS PER 120,1,b,c&d M-1 AIR SITE NO INSPECTIONS WILL BE MADE 4x BLOCKING BY G <br /> cfm of the units serving the TI space exceeds 2000 BALANCE <br /> cfm, all HVAC equipment shall have duct smoke 7, NATURAL VENTILATION PER 120,1,b,1 N/A ("12 <br /> detectors. All duct smoke detectors shall be wired 8. CONTROLS SHALL MEET REQUIREMENTS PER 122, SEE M-0 MAU— CURB M❑U N T <br /> to shut down all units when a single unit alarms, AND NOTES, DETAILM O JOB # 2019-105 <br /> When fire detection or alarm systems are provided 9, SHUT DOWN AND BACKDRAFT DAMPERS PER 122,E See REV= 1 for the building, all smoke detectors including those schedules on M-0 <br /> installed for fire smoke dampers shall be supervised 10. ISOLATI❑N AREA DEVICES PER 122,g N/A GDMD ENGINEERING, INC <br /> by such systems per 608,1 CMC. Such connections 11, PIPE INSULATI❑N PER 120,3,8 SEE NOTES, TABLE 120,3-A Mechanical and Safety Engineers <br /> shall be shown on the deferred fire alarm submittal, 12. REQUIREMENTS FOR DUCTS AND PLENUMS PER 124 SEE 212 W Pine dSt, Ste 4 M <br /> 11, Such connections shall be shown on clef fire M-0, NOTES AND SPECIFICATIONS CITY OF STOCKTON <br /> alarm submittal. 13. MECHANICAL ACCEPTANCE TEST FORMS SUBMITTED AT END Lodi, Ca 95242 <br /> 12, All exposed ductwork shall be GI pipe and fittings, OF PROJECT PER SECTI❑N 120,5, 120.7 AND 120,8 - SEE Ph 209-367-0899 <br /> Line all rectangular duct with insulation with the T24 DRAWINGS FOR FORMS REQUIRED (1-17) TO BE APPROVED PLANS Fax 209-367-0898 <br /> R-value listed in T-24 for the location of the duct SUBMITTED AT THE END OF THE PROJECT FOR EACH HVAC <br /> (attic, conditioned or outside). All duct materials AND PLUMBING SYSTEM, AND FOR EACH HVAC AND By:dhenry Date:08/06/2020 E-mail:gdmdengrinc@sbcglobal.net Copyright APEX <br /> from insulation to mastics including but not limited to PLUMBING PIECE OF EQUIPMENT, <br />