My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
1605
>
1600 - Food Program
>
PR0505807
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/1/2021 2:17:50 PM
Creation date
3/23/2021 9:30:55 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
1600 - Food Program
File Section
WORK PLANS
RECORD_ID
PR0505807
PE
1615
FACILITY_ID
FA0006185
FACILITY_NAME
El Dorado Gas & Mart
STREET_NUMBER
1605
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
16703101
CURRENT_STATUS
02
SITE_LOCATION
1605 S EL DORADO ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\jcastaneda
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 T <br /> APEX <br /> ARCHITECTURE <br /> - A <br /> 3'RD-1 3-RD-1 0 3'RD-10 845 S. Commerce Street <br /> nW/❑F-1 �= \ w/0F-1 �o w/❑F-1 Stockton, CA. 95206 <br /> 2'VTR2'VTR-"'� 209 662-4874 <br /> � 2'VTR� <br /> / \ <br /> 2'v 2"VTR apexplanning@hotmail.com <br /> Steven Anthony Torres II <br /> 1'DRAIN FROM 8"ERIC PIPE FOAM <br /> MAU-1 AND PIER BLOCK / 3/4'C SPILL Architect # C32553 <br /> 3/4'C FROM <br /> HVAC UNITS - T❑ MS-1 <br /> SPILL T❑ MS-1 D �� ��� 3 3 T iC0 CFH DOWN <br /> / /THRU ROOF \ ALL EXISTING ABOVE SLAB PLUMBING <br /> 4'G 72 <br /> / c H DOWN <br /> TO BE DEM❑'D AND REMOVED OFFSITE, <br /> TH U ROOF <br /> v <br /> ® 1/2'CW RISER <br /> WITH HB-1 / , GAS SIZING TABLE <br /> 4•vTR � \ / O � DEVLEL❑PED PIPE CFH <br /> L' <br /> 3 3 100' 1/2" 50 <br /> 3"VTR , <br /> co SIZES FROM 3/4" 104 <br /> TABLE 1216,2(1) <br /> © — — — — — — — — <br /> 2016 CPC 1" 195 <br /> \ / 1-1/4" 400 <br /> / 1-1/2" 600 <br /> 2" 1160 EL DORADO GAS <br /> / 2-1/2" 1840 <br /> STATION <br /> O O ® ® 50 3" 3260 IMPROVEMENT <br /> 1605S.1 PLUMBING REVISED ROOF PLAN Stockton, <br /> , DORADO STREET <br /> Stocn, CA. 95206 <br /> SCALE: 1/4" = 1'-0" <br /> ❑F-1 <br /> SET OVERFLOW LEVEL WITH SINGLE PLY R❑❑FING - <br /> FINISHED ROOF TAPER PER R❑❑FING <br /> PANUFACTURER'S <br /> SINGLE PLY R❑❑FING - TAPER PER SPECIFICATI❑NS <br /> R❑❑PING PANUFACTURER'S <br /> SPECIFICATI❑NS TOWARDS DRAINN <br /> XX <br /> SET DRAIN ON BLOCKING AND <br /> PLYWOOD - STRUCTURAL o DRILL FOR OF PIPE PLAN REVIEW ACCEPTANCE <br /> DRAWINGS <br /> DECK CLAMP W/BOLTS - INSTALL Aug 04 2020 <br /> PER R❑❑FING MANUFACTURER'S SEE DETAIL 1/PO FOR <br /> SPECIFICATI❑NS ROD ATTACHMENT <br /> 4 BAND CLAMP AT PIPE CLEVIS HANGER W/1/2' WEST COAST CODE CONSULTANTS <br /> DRAIN CONNECTION ALL THREAD ROD (ATR) <br /> SEISMICALLY BRACED PER <br /> DETAIL 1/PO <br /> 4 BAND CLAMP AT <br /> ELBOW W/SUPP❑RT <br /> _/ <br /> WITHIN 6'❑F <br /> ELBOW <br /> RD-1 SINGLE PLY R❑❑FING - <br /> SET ROOF DRAIN 2" BELOW TAPER PER R❑❑FING <br /> FINISHED ROOF PANUFACTURER'S <br /> SPECIFICATI❑NS <br /> SINGLE PLY ROOFING - TAPER <br /> PER R❑❑FING PANUFACTURER'S <br /> SPECIFICATI❑NS <br /> PLYWOOD - <br /> STRUCTURAL DRAWINGS 7 <br /> DECK CLAMP W/BOLTS - <br /> INSTALL PER R❑❑FING <br /> MANUFACTURER'S <br /> SPECIFICATI❑NS SEE DETAIL 1/PO FOR <br /> ROD ATTACHMENT <br /> 4 BAND CLAMP AT PIPE CLEVIS HANGER W/1/2' <br /> DRAIN CONNECTION ALL THREAD ROD (ATR) <br /> SEISMICALLY BRACED PER <br /> DETAIL 1/PO <br /> 4 BAND CLAMP AT <br /> ELBOW W/SUPPORT PLUMBING REVISED ROOF PLAN <br /> WITHIN 6"❑F <br /> ELB❑W <br /> ROOF DRAIN AND OVERFLOW DETAIL 1 5 CONAL <br /> S F <br /> DETAIL P 2 <br /> * '--NO. M29759'' <br /> lf1 REN. 6-30— <br /> ,A <br /> -30- ' Q <br /> 9� cNAN�G�O�� <br /> OF C N� <br /> APEX 08-32 <br /> PROJECT: <br /> TPLANS ARE SUBJECT DATE 1/29/2020 <br /> FIELD APPROVAL <br /> THESE <br /> IF THESE PLANS ARE NOT ON THE JOB REV.# DATE ISSUED DESCRIPTION <br /> SITE NO INSPECTIONS WILL BE MADE 0 <br /> JOB # 2019-105 <br /> REV= 1 <br /> GDMD ENGINEERING, INC <br /> Mechanical and Safety Engineers <br /> 212 W Pine St, Ste 4 P Z <br /> CITY OF STOCKTON Lodi, Ca 95242 <br /> Ph 209-367-0899 <br /> APPROVED PLANS Fax 209-367-0898 <br /> By:dhenry Date:08/06/2020 E-mail:gdmdengrinc@sbcglobal.net Copyright APEX <br />
The URL can be used to link to this page
Your browser does not support the video tag.