Laserfiche WebLink
UNDERGROUND STORAGE TANK <br /> MONITORING SYSTEM CERTIFICATION FORM (Page 4 of 61 <br /> VIIIV MONITORING SYSTEM AND PROGRAMMING <br /> This section must be completed if a monitoring panel is used to perform leak detection monitoring. Y N NA <br /> Are the visual and audible alarms operational? ® ❑ ❑ <br /> Were all sensors visually inspected for kinks and breaks in the cables and for residual buildup to ensure that floats move freely , ® ❑ <br /> functionally tested, and confirmed operational? <br /> Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will not interfere with their ® ❑ ❑ <br /> proper operation? <br /> Was monitoring system set-up reviewed to ensure proper settings? ® ❑ ❑ <br /> Was the monitoring panel's backup battery visually inspected , functionally tested, and confirmed operational? _ ® ❑ ❑ <br /> Does the flow of fuel stop at the dispenser If a leak is detected in the underAispenser containment? ® ❑ ❑ <br /> Does the turbine automatically shut down if the piping secondary containment monitoring system fails to operate or is electrically ® ❑ ❑ <br /> disconnected? <br /> Does the turbine automatically shut down if the piping secondary containment monitoring system detects a leak? ® ❑ ❑ <br /> Which sensors initiate positive shut down? (Check all that apply.) ® Sump ® UnderAlspenser containment <br /> If alarms are relayed to a remote monitoring station , is all communications equipment (e.g . modem) operational? ® ❑ ❑ <br /> For any answer of "N" above, describe in section 1X how and when these deficiencies were or will be corrected. _ <br /> IX. COMMENTS <br /> X. IN-TANK GAUGING TESTING <br /> Check this box if tank gauging is used only for inventory control. (Do not complete this section.) <br /> ❑ Check this box if NO tank gauging equipment is installed. (Do not complete this section.) Y N NA <br /> This section must be completed if in-tank au in is used to perform leak defection monitoring. <br /> Has all input wiring been inspected for kinks and breaks in the cables and for proper entry and termination , including testing for ground [30 <br /> ❑ <br /> fauks? <br /> Were all in-tank gauging probes visually inspected for damage and residue buildup to ensure that floats move freely, functionally tested, <br /> 01 01 El <br /> j and confirmed operational? <br /> I Was accuracy of system's product level readings tested? ❑ ❑ ❑ <br /> Was accuracy of system's water level readings tested? 01 ❑ ❑ <br /> E Were all probes reinstalled property? ❑ 01 ❑ <br /> 4 Were all items on the equipment manufacturer's maintenance checklist completed? ❑ ❑ ❑ <br /> For any answer of "N" above describe in section Xl how and when these deficiencies were or will be corrected. <br /> XI . COMMENTS <br />€ Y = Yes, N = No, NA = Not Applicable <br /> i <br />