Laserfiche WebLink
SunStar 25712 Commercentre Drive <br /> l Laboratories, Inc. Lake Forest,California 92630 <br /> 949.297.5020 Phone <br /> Paowtanr t)i.�u..rry A��.ata-ncu..Sexvtres Nn�ttoawtne <br /> 949.297.5027 Fax <br /> WGR Project: NuStar Stockton Terminal <br /> 11021 Winners Circle Suite 101 Project Number: [none] Reported: <br /> Los Alamitos CA,90720 Project Manager: Gray Martz 03/17/2108:12 <br /> PL-17 @ 5' <br /> T210804-15(Soil) <br /> Reporting <br /> Analyte Result Limit Units Di!LKion Bauch Prepared Analyzed Method Nass <br /> SunStar Laboratories,Inc. <br /> Extractable Petroleum Hydrocarbons by 8015B <br /> C6-C12(GRO) 39 10 mg/kg 1 1031044 03/10/21 03/14/21 EPA8015B <br /> C13-C28(DRO) 150 10 " <br /> C29-C40(MORO) 13 10 " <br /> Surrogate:p-Terphenvl 113% 65.135 " <br /> Metals by EPA 6010B <br /> Lead 13 3.0 mg/kg 1 1031031 03/10/21 03/13/21 EPA 6010b <br /> Volatile Organic Compounds by EPA Method 82608 <br /> Bromobenzene ND 120 ug/kg i 50 1031036 03/10/21 03/11/21 EPA 8260B R-07 <br /> Bromochloromethane ND 120 R-07 <br /> Bromodichloromethane ND 120 R-07 <br /> Bromoform ND 120 R-07 <br /> Bromomethane ND 120 R-07 <br /> n-Butylbenzene ND 120 R-07 <br /> sec-Butylbenzene ND 120 R-07 <br /> cert-Butylbenzene ND 120 R-07 <br /> Carbon tetrachloride ND 120 R-07 <br /> Chlorobenzene ND 120 R-07 <br /> Chloroethane ND 120 R-07 <br /> Chloroform ND 120 R-07 <br /> Chloromethane ND 120 R-07 <br /> 2-Chlorotoluene ND 120 R-07 <br /> 4-Chlorotoluene ND 120 R-07 <br /> Dibromochloromethane ND 120 R-07 <br /> 1,2-Dibromo-3-chloropropane ND 250 R-07 <br /> 1,2-Dibromoethane(EDB) ND 120 R-07 <br /> Dibromomethane ND 120 R-07 <br /> 1,2-Dichlorobenzene ND 120 R-07 <br /> 1,3-Dichlorobenzene ND 120 R-07 <br /> 1,4-Dichlorobenzene ND 120 R-07 <br /> Dichlorodifluoromethane ND 120 R-01 <br /> 1,1-Dichloroethane ND 120 R-07 <br /> SunStar Laboratories,Inc. The results in this report apply to the samples analyzed in accordance with the chain of <br /> custody document.This analytical report must be reproduced in its entirety. <br /> Mike.laroudi,Project Manager Page 52 of 105 <br />