My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
COUNTRY CLUB
>
1403
>
2300 - Underground Storage Tank Program
>
PR0231995
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/18/2023 3:31:12 PM
Creation date
3/26/2021 3:44:45 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0231995
PE
2361
FACILITY_ID
FA0006438
FACILITY_NAME
United # 5446
STREET_NUMBER
1403
Direction
W
STREET_NAME
COUNTRY CLUB
STREET_TYPE
BLVD
City
STOCKTON
Zip
95204
APN
12323246
CURRENT_STATUS
01
SITE_LOCATION
1403 W COUNTRY CLUB BLVD
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
254
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ISD Vapor Flow Meter Installation Installation Steps-Balance Systems Below Shear Valve <br /> — Black <br /> To <br /> Seal-off , i From <br /> Console i i ISD Flow Meter <br /> , .+ • White <br /> 6'�1/2"rigid <br /> conduit <br /> Epoxy sealed connections in a <br /> -ate K,m-,.eas weatherproof junction box <br /> Figure 2. Field wiring Vapor Flow Meter-Observe Polarity <br /> Installation Steps - Balance Systems Below Shear Valve <br /> 1. Before installing this device,turn Off,tag/lock out power to the system, including console and submersible <br /> pumps. <br /> 2. Remove the dispenser's lower sheet metal doors to access the vapor plumbing, if necessary. <br /> 3. Remove any unneeded field installed plumbing between the vapor shear valve and the vapor return line fitting. <br /> Figure 3 shows two example installations of the Vapor Flow Meter with the required lateral or Wye fitting for <br /> running the TP-201.4 back-pressure test. Approximately 3 inches of clearance is required on both sides of the <br /> piping to accommodate the width of the meter body. <br /> Q IMPORTANT: Upper and lower flanges must align to within 1/16"center-to-center before install- <br /> ing flow meter. If piping is improperly aligned,torque could damage the flow meter and result in <br /> vapor leakage. <br /> 4. Connect the lower flange to the pipe that is connected to the lateral or Wye access fitting (see Figure 4). <br /> 5. Install the Vapor Flow Meter over the lower flange. <br /> 6. Connect the upper flange with o-ring above the Vapor Flow Meter. <br /> 7 Using a close nipple,thread the shear valve into the upper flange. <br /> 8. Using nipples, unions, and other plumbing as required, connect the plumbing outlet to the shear valve. <br /> 9. Route the wiring into the junction box via the supplied cord grip assembly. Connect the wires from the Vapor <br /> Flow Meter to the field wiring from the console and cap with wire nuts (see Figure 2) - OR- connect the wires <br /> to the TLS RF transmitter(W2). <br /> 10. After all other ISD Vapor Flow Meters and the ISD Pressure Sensor are installed, pressurize the tank ullage <br /> space and vapor piping to at least 2 inches WC and test for leaks using leak detection solution. <br /> 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.