Laserfiche WebLink
California Environmental Reporting System (CERS) Underground Storage Tank- Monitoring Plan <br /> Facility/Site <br /> United#5446 UST Tank#/CERS Tank CERS ID <br /> ID# 10182103 <br /> 1403 W COUNTRY CLUB BLVD TA0199511/ <br /> 10182103-004 <br /> TOCKTON,CA 95204 Tank Info:Installed Date:1/1/199112:00:00 AM-Tank Use:Hazardous Waste(includes <br /> used oil)-Tank Contents:Used Oil-Type Of Tank:Double Wall-Piping Construction: <br /> Double-walled <br /> Pipe Monitoring is Performed Using the Following Method(s) <br /> Yes Continuous Monitoring of Piping Secondary Containment <br /> Piping Secondary Containment Panel Manufacturer Leak Sensor Manufacturer <br /> Dry Ronan Ronan <br /> Panel Model# Leak Sensor Model# <br /> X-76S LS-3 <br /> Leak Alarm Triggers Automatic Pump Shutdown <br /> Failure/Disconnect Triggers Pump Shutdown <br /> Mechanical Line Leak Detector Performs 3 GPH Leak Test <br /> MLLD Manufacturer MLLD Model <br /> Electronic Line Leak Detector Performs 3 GPH Leak Test <br /> ELLD Manufacturer ELLD Programmed In-Line Testing ELLD Triggers Automatic Pump Shutdown <br /> ELLD Model ELLD Failure/Disconnect Triggers Automatic Shutdown <br /> Pipeline Integrity Testing Visual Pipeline Monitoring <br /> Pipeline Integrity Testing Frequency Visual Pipeline Monitoring Frequency <br /> Suction Piping Meets Exemption Criteria <br /> No Regulated Piping Per Health and Safety Code,Division 20,Chapter 6.7 Is Connected To The Tank System <br /> Other Pipeline Monitoring <br /> Under Dispenser Containment(UDC)Monitoring <br /> UDC Monitoring Detection of Leak into UDC Triggers Audible and Visual Alarms <br /> No Dispensers <br /> UDC Leak Alarm Triggers Automatic Pump Shutdown <br /> UDC Panel Manufacturer <br /> Failure/Disconnection of UDC Monitoring System Triggers Automatic Pump Shutdown <br /> UDC Panel Model# <br /> UDC Monitoring Stops Flow of Product at Dispenser <br /> UDC Leak Sensor Manufacturer <br /> UDC Construction <br /> UDC Leak Sensor Model <br /> UDC Secondary Containment Monitoring <br /> Leak Within Secondary Containment of UDC Causes Audible and Visual Alarms <br /> Periodic System Testing <br /> ELD Testing <br /> Yes Secondary Containment Testing <br /> Yes Spill Bucket Testing <br /> Printed on 2/1/20213:46 PM <br />