Laserfiche WebLink
wilvill V1 I willwilw, IL IL will f f a 1 f <br /> OPW 71SO Overfill Materials Important <br /> Prevention Valves f In order to prevent product <br /> Valve Body: Cast aluminum spillage from the Underground <br /> The CARB -certified OPW 71 SO Storage Tank (UST), properly <br /> Float: Nitrile rubber, closed cell foam maintained delivery equipment <br /> vapor tight Overfill Prevention Valve Valve: Aluminum I and a proper connection at the <br /> is designed to prevent the overfill of tight-fill adaptor are essential, <br /> underground storage tanks by providing Seals : Viton® Delivery personnel should <br /> a positive shut-off of product delivery. Upper & lower Drop Tube : Aluminum to managed and trained <br /> p p ry• pp p � "' ' to inspect delivery elbows <br /> The shut off valve is an integral part ofPlastic parts: Acetal and hoses for damaged and <br /> the drop tube used for gravity filling. o missing parts. They should <br /> The OPW 71 SO allows easy installation Hardware: Stainless steel SA oil always make certain there <br /> y Is a positive connection <br /> (without breaking concrete) and requires rf 'ffli between the adaptor and <br /> Features elbow. If delivery equipment <br /> no special manholes. 4� Simple, Easy and Quick is not properly maintained, <br /> The OPW 71 SO is a vapor-tight two- Installation winno excavation or or the elbow isnot securely <br /> stage shut-off valve. When the liquid s ecial manholes re uired . coupled to the adaptor, a <br /> p q serious spill may result when <br /> level rises to about 95 % of tank Economical — costs a fraction the OPW 71 SO closes, causing <br /> capacity, the valve mechanism is a hazard and environmental <br /> released, closing automatically with of expensive, complicated and contamination, <br /> the flow. This reduces the flow rate to difficult-to install valves. <br /> Furnished Complete — supplied approximately 5 gpm through a bypass p NOTE: The OPW 71 SO Is <br /> valve. The operator may then stop the with new upper and lower drop tubes, designed for use on tight fill <br /> gravity drop applications only. <br /> filling process and disconnect and drain mounting hardware and thorough Do not use for pressure <br /> the delivery hose. As long as the liquid instructions for quick job site time. fill applications, <br /> exceeds the 95 % level, the valve will 40� Completely Automatic Operation <br /> close automatically each time delivery .- no prechecks to perform, no resets Retrofits Directly — for both new <br /> is attempted, and no overrides to be broken and existing tanks with 4 " fill risers . <br /> If the delivery is not stopped and the or abused . Quick Drain Feature was <br /> liquid rises to about 98% of tank •® No Pressurization of the Tank was automatically drains hose when head <br /> capacity, the bypass valve closes operates directly from liquid level. pressure is relieved. <br /> completely. No additional liquid can flow ® �Will Accept a Dipstick • Best Flow Rate in The Industry* <br /> into the tank until the level drops below for Gauging <br /> a reset point. • OPW rest Lab results <br /> NOTE : The 71 SO Overfill Prevention <br /> Valve can be adjusted to shutoff at any Advantages of Overfill Prevention <br /> desired tank capacity. Please contact the Compared to Overfill Warning Systems: <br /> Authority Having Jurisdiction (AHI) and ® Completely Automatic faster fill times and reducing <br /> review local, state, and national codes to Operation — does not rely on the spill risk . <br /> determine the regulatory requirements alertness ors eed of res once of the <br /> governing shut-off capacity in your p p Speeds Delivery Operations <br /> region, as well as take into account delivery attendant for certainty of — product flows unimpeded into <br /> other considerations such as extreme overfill prevention . the tank until the hose " kick " that <br /> tank tilt. In all cases, the upper tube Keeps the Top of UST " Dry, " accompanies the valve shut-off <br /> must protrude into the tank at least per EPA Requirements — provides a clear signal that the <br /> 61 /2 " to ensure that the valve can shut eliminating possible leaks at loose liquid has reached the shut-off level , <br /> off flow into the tank completely before bung fittings and the need for Simple and Inexpensive <br /> the top of the tank is wetted as per double containment on vent lines. Installation - in both two-point <br /> EPA requirements. ill Does Not Rely on Pressure in and coaxial fill applications, no ; <br /> the UST to Stop Flow � allowing additional excavation, manholes or <br /> 71 SO Instruction Sheet Order vent piping are required. <br /> Number: HISS24PA <br /> Look for this label for <br /> Listings and@ULq= authentic <br /> eallfornla air pproved products. <br /> Certifications Resources Board o,>wr OPW 715OM is EVR Approved for E85 <br /> 9i I <br /> B t I <br /> s <br /> f <br />