My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FLAG CITY
>
14931
>
2300 - Underground Storage Tank Program
>
PR0506221
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/2/2022 1:20:02 PM
Creation date
3/26/2021 3:48:14 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0506221
PE
2361
FACILITY_ID
FA0007287
FACILITY_NAME
BAI PETRO INC. #83680
STREET_NUMBER
14931
Direction
N
STREET_NAME
FLAG CITY
STREET_TYPE
BLVD
City
LODI
Zip
95242
CURRENT_STATUS
01
SITE_LOCATION
14931 N FLAG CITY BLVD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
134
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tank <br /> Secondary Containment Testing Report Form <br /> 6. TANK SECONDARY CONTAINMENT TEST <br /> Test Method Developed by ❑ Manufacturer © Industry Standard ❑ Professional Engineer <br /> Test Type ❑ Pressure © Vacuum ❑ Hydrostatic <br /> Test Equipment Used: Vacuum Pump/Vacuum Gauges in Hg. <br /> Tank ID 1-87 2&3-91-Dsl. <br /> Tank Manufacturer CSI CSI <br /> Tank Capacity 20K 20K 2 Compt. <br /> Test Start Time 12:50 12:40 <br /> Initial Reading -10" Hg. -10" Hg. <br /> Test End Time 2:50 2:40 <br /> Final Reading -10" Hg. -10" Hg. <br /> Change in Reading 0 0 <br /> Pass/Fail Criteria No Loss No Loss <br /> Tightness Test Results ® Pass ❑ Fail I ® Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> 7. PIPE SECONDARY CONTAINMENT TEST <br /> Test Method Developed by ❑ Manufacturer ® Industry Standard ❑ Professional Engineer <br /> Test Type ® Pressure ❑ Vacuum ❑ Hydrostatic <br /> Test Equipment Used: Pressure Gauges in Psi/Nitrogen <br /> Pipe Run ID 1-87 2-91 3-Diesel <br /> Pipe Manufacturer Smith Smith Smith <br /> Test Start Time 12:55 12:45 12:35 <br /> Initial Reading 5 Psi 5 Psi 5 Psi <br /> Test End Time 1:55 1:45 1:35 <br /> Final Reading 5 Psi 5 Psi 5 Psi <br /> Change in Reading 0 0 0 <br /> Pass/Fail Criteria No Loss No Loss No Loss <br /> Tightness Test Results © Pass ❑ Fail © Pass ❑ Fail ® Pass ❑ Fail ❑ Pass ❑ Fail <br /> Pipe Run ID <br /> Pipe Manufacturer <br /> Test Start Time <br /> Initial Reading <br /> Test End Time <br /> Final Reading <br /> Change in Reading <br /> Pass/Fail Criteria <br /> Tightness Test Results ❑ Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> Additional copies of this page may be attached. <br /> All tests marked "Fail'and any repairs made before or during the tightness test must be described in <br /> the COMMENTS section. <br /> Page 2of5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.