My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FLAG CITY
>
14931
>
2300 - Underground Storage Tank Program
>
PR0506221
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/2/2022 1:20:02 PM
Creation date
3/26/2021 3:48:14 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0506221
PE
2361
FACILITY_ID
FA0007287
FACILITY_NAME
BAI PETRO INC. #83680
STREET_NUMBER
14931
Direction
N
STREET_NAME
FLAG CITY
STREET_TYPE
BLVD
City
LODI
Zip
95242
CURRENT_STATUS
01
SITE_LOCATION
14931 N FLAG CITY BLVD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
134
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Elite IV Contractors <br /> Date: 11/09/2021 <br /> Inspection Request: 11/11/2021, Thursday at 2:30 PM <br /> Inspection Site: SRoo83730 <br /> Bai Petro Inc. #83730 /Arco <br /> 14931 N Flag City Blvd. Lodi, CA 95242 <br /> Scope Of Work: Replace the 87, 91 & diesel, in-sump spill container and the 87, 91 <br /> & diesel drop tubes &shut off valve (flapper) on the underground <br /> storage tank. <br /> Inspections: A) Spill bucket test: Verify minimum 5-gallon capacity and pass one- <br /> hour hydrostatic test after concrete is set. Proper drainage must <br /> also be verified. <br /> B) Overfill prevention verification: Measurement of drop tubes to <br /> verify 95% of tank volume shut off. Verification of flapper <br /> functionality. Ensure that all tank charts and calculations are <br /> available for review at the time of inspection. <br /> C) Verification that ball floats, if installed, do not interfere with the <br /> installed flapper valve. <br /> Thank you, <br /> DcborAj ones <br /> Administrative Assistant <br /> Elite IV Contractors <br /> dispatch@eliteiv.com <br /> (209)461-6337 (work) <br /> (209)461-6342 (fax) <br /> Phone:(209)461-6337 Fax:(209)46i-6342 ' 2535 Wigwam Dr.Stockton,CA 95205 <br /> Email:dispatch@eIiteiv.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.